Laserfiche WebLink
CLOSED CM WOR1C ORDERB REPORT <br />Total Utility Maintenance Management System <br />08/11/1995 _____ <br />�{ <br />Page 1 <br />Date Range :O1/09/1989 - 08/04/1995 <br />- Pattern :7101196730106 <br />CM Work Order Range :1001091070001 - UT2608- pattern :* <br />Item Range :<Blank> - WP122020001 <br />program ALL Function ALL Activity ALL_____________________________ <br />�( WpRiC ORDER ID: 7101196730106 Title: <br />«DUPLICATE PRINTING OF THIS WORK ORDER» <br />item ID: WML1895G06 -- WATER MAIN LINE <br />Location ID: Function 119 <br />Program 710 <br />Date Completed: 07/27/1995 <br />Overall Craft: <br />Issued: 06/21/1995 <br />out of Service? No <br />Meter Read�ng: <br />Downtime: o hours <br />Status: <br />Laboi: <br />Craft ID Name <br />WST <br />WST <br />EO <br />UL <br />UL <br />SUP2 <br />DL <br />HEO <br />EO <br />UL <br />A'�E <br />BBA <br />CCL <br />DMJ <br />GA7 <br />GJ <br />JGD <br />JRM <br />PTN <br />SWU <br />Materials: <br />ID <br />REIACATE 1000 W• �RINE V1�w ux. <br />ACtiVlty 673 <br />Issued by: AGE Assigned to: <br />Travel Time: 0.00 Hr. <br />Priority: <br />ALLEN, G�Y E• <br />BRADLEY, BROCK A. <br />CRAIG, CHESTER L. <br />DOUCETTE, MARK J <br />GOSS, DANNY JAMES <br />GAR2A, JOHN (NMI) <br />JACOBS, GREGORY DEAN <br />JOHNSON, RICHARD M. <br />PINON, THOMAS N. <br />STENSETH, WOB URT <br />CEME00061438 <br />COUP42024947 <br />MEGA42044547 <br />MEGA44044447 <br />METE42147447 <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />pZPE42055247 <br />pIPE42055247 <br />Planned Hrs <br />Description ___________ <br />CEMENT 20 MIN. SET 50 LB. BAG <br />COUPLING 4"DI&CI X 4"DI&CI <br />MEGALUG 4" SERIES #1104 <br />MEGALUG 6" SERIES #1106 <br />METER 4" NEPTL7NE PROTECTUS 111 <br />4" FOLL. RING (FROM STOCK) <br />6" FOLL. RING (FROM STOCK) <br />2" X 2' IRON YIPE (FROASSOC)K' <br />TOp COARSE (ASSOC) <br />TOP COARSE (ASSOC) <br />pUMP FEE �pSSOC) <br />C. D. F. WII�DER) <br />TOP COARSE <br />pIpE 4" TYTON JOINT DI <br />pIPE 4" TYTON JOINT DI <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />Actual Hrs <br />20.00 <br />4.00 <br />4.00 <br />12.00 <br />4.00 <br />15.00 <br />8.00 <br />12.00 <br />16.00 <br />16.00 <br />Total Labor Cost: <br />Date # Used <br />07/27/1995 <br />07/27/1995 <br />07/27/1995 <br />p'7�27/1995 <br />07/27/1995 <br />07/27/1995 <br />07/27/1995 <br />07�27/1995 <br />p��31/1995 <br />07/31/1995 <br />07/31/1995 <br />p7/31/1995 <br />07/31/1995 <br />07/27/1995 <br />07/27/1995 <br />1 <br />2 <br />1 <br />1 <br />4 <br />2 <br />2 <br />1 <br />1 <br />1 <br />1 <br />1 <br />6 <br />6 <br />Cost <br />407.40 <br />65.44 <br />74.68 <br />177.96 <br />48.84 <br />369.75 <br />68.00 <br />238.20 <br />296.48 <br />242.72 <br />1989.47 <br />Cost <br />11.21 <br />92.58 <br />27.14 <br />16.25 <br />4573.00 <br />44.00 <br />3.00 <br />45.52 <br />54.28 <br />18.31 <br />253.56 <br />143.23 <br />36 24 <br />36.24 <br />�:��J i ��L C���G��di�S <br />