My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
566 E MARINE VIEW DR B 2016-01-01 MF Import
>
Address Records
>
E MARINE VIEW DR
>
566
>
566 E MARINE VIEW DR B 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2017 6:17:51 AM
Creation date
2/27/2017 6:17:43 AM
Metadata
Fields
Template:
Address Document
Street Name
E MARINE VIEW DR
Street Number
566
Unit
B
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> PUBLIC WORKS PERMIT COMMENTS <br /> 4. As per Pubiic Works approved plan dated _ <br /> 5. Connect side sewer per City Standard #601. <br /> (6: Connect side sewer per City Standard #'s 601, 602, 604. <br /> �7,� Connect all rooftop downspouts to the side sewe . <br /> 8. Connect rooftop downspouts to the drainage sys em provided for this lot. <br /> 9. Rooftop runoff must be discharged to a roof downspout infiltration system per City of Everett <br /> Storm Manuai 3-2.6.2. Width _, Dep;h _, Length _. <br /> 10. A catch basin as per City Standard Plan #402 with a gas trap per Standard Pian �410 is <br /> required for the parking area. <br /> �t. Remove and replace curb, gutter snd sidewalk as per City of Everett Standard Ptan �'s 305A <br /> & 306 on this proposal's frontage as directed by the P�b!ic Works Inspector (i.e. all unused <br /> driveways and any broken or damaged ar?a rnust be repiacedl. <br /> 12. Install a Type I concrete driveway per City of Everr .;tandard #307. <br /> 13. Pave drive�vay from the front property Iine out �o ihe street paving. <br /> 14. Contact the Water District for c�nnecting provisions for this buiiding's <br /> water and sewer services. <br /> 15. If a sewer pump system is to he installed, the pressure lir,e must discharae into a private <br /> manhole, then graviry flow across the public right-of-way. <br /> 16. The contractor must meet with the Public Works Inspector to discuss potential drainage <br /> routing prior to beginning the project. <br /> 17. A sprinkler system is required for this building in compliance with the requirements of NFDA <br /> Standards 13D. <br /> 18. All excavated material from foundation, sidewalk and driveways s'�all be hauled to an <br /> approved, permitted site. No wasting of material is allowed on this building lot. <br /> �� - :I �.. , <br /> i ' L l � -';� {l � �.�� 'i � Y�'�, �1:� ll C .,�j..���1 �ii. <br /> �. f�i('�I Il�',�,�� f � � li �i}1�'Lli. . 4.J � L� 'I 'C <br /> , � ':l'� ,��i �. (�i -r:'.�.+t+�!�rt..l1, 'S /rrJ � .. ✓�)�f � ' � _ - ' - -/ � <br /> i <br /> PYlCcmmerts �/ <br /> � y <br />
The URL can be used to link to this page
Your browser does not support the video tag.