My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1400 SEINER DR 2018-01-01 MF Import
>
Address Records
>
SEINER DR
>
1400
>
1400 SEINER DR 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 3:57:51 PM
Creation date
2/27/2017 6:21:15 AM
Metadata
Fields
Template:
Address Document
Street Name
SEINER DR
Street Number
1400
Notes
PORT INFRASTRUCTURE (Address changed from 1400 W Marine View Dr to 1400 Seiner Dr as of 9/2019)
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PORT OF EVERETT <br />W MARINE VIEW DR <br />IMPROVEMENTS <br />7-14 HYDRANTS <br />Descriotion <br />Section 7-14.1(1) supplemer,ted with the following: <br />CIP N0. 3A-003-09 <br />PROJECTNO. <br />PD-WM-20006-01 <br />This section also covers the permanent removal of existing dry barrel fire hydranls. <br />Construction Requirements <br />Section 7-14.1(3) suppiemented with the following: <br />The Contractor must coordinate this effort with City of Everett Public Works Departrnent. City forces <br />shall perform the actual resetting of the existing hyd2nt. <br />Section 7-14.1(4) supplemented with the following: <br />The Contractor must ceordinate this effoR with City of Everett Public Works Department. City forces <br />shall perfortn the actuai moving of the exisGng hydrant. <br />Remove Existinc Hvdrant INew Sectionl <br />Section 7-14.317) <br />Where shown in the Plans, hydrants shall be removed. The Conlractor must coordinate this effort with <br />City of Everett Public Works Department. City torces shall perform the actual hydrant removal. <br />Measurement <br />Section 7-14.4 is supplemented with the following: <br />The measurement of Bid Item —Remove Existing Hydrant- will be made per each. <br />Payment <br />Section 7-14.5 is supplemented with the (ollowing: <br />The payment of Bid Ilem —Remove Existing Hydrant- will be made per each. <br />Page 30 of 50 <br />
The URL can be used to link to this page
Your browser does not support the video tag.