Laserfiche WebLink
! <br />1. Provide for rcproduction of Conaact Documents. <br />Ta�k Delivenbla <br />1. Review Conrract Documenu (50%) <br />2. Review Conaact Documeau (90%) <br />3. Final Contract Documenu <br />4. Full-Size Mylar Drawings (22"�t34'� <br />TASK 3 - BIDDING ASSISTANCE <br />8 copia <br />8 copia <br />I copy+originals <br />1 ut <br />This task includes the provision of bidding assistaace for the proposed improvemeau including: <br />1. Attend prebid confereace <br />2. Rupond to questions during bidding process (451iay maximum bidding perio� <br />3. Prepare one addendum <br />Rapocsibilitia of Owner <br />1. P'rovide discibudon of Contract Documenu <br />2. Maintain Plan Holders list <br />3. Make disu�ibution of any Addenda <br />Ta�k Delivenbles <br />1. Addenda (if mquired) <br />TASI{ 4- CONSTRUCTION ENGINEERIIVG ASSISTANCE <br />Rapon�ibilitia of Enginar <br />I <br />2. <br />3. <br />.� <br />Review shop drawing submitted by Con�actor. The total number of shop drawings is <br />estimated at 30. A total of 120 staff hours have been budgeted for shop drawing review. <br />Provide a maYimum of 10 site visiu and submit status report to Ciry. <br />Respond ro Ciry and Contractor questions on Contact Documents. <br />p: t000J? 01 %IrufOlW�ndJ.dor <br />Is <br />