Laserfiche WebLink
PORT OF EVERETT SECTION 02371 <br />14�� STREET BULKHEAD REPLACEMENT TEMPORARY EROSION AND <br />SEDIMENTF TION CONTROL <br />A. Locate existing utilities, avoid damage or disturbance. Call "Dial Dig <br />I-800-424-5555;' 48 hours (two working days) before beginning construction. <br />B. <br />C. <br />D. <br />E. <br />F. <br />G. <br />H. <br />I. <br />J. <br />K. <br />L. <br />Employ and pay for a locator service to ]ocate and mark utilities in addition to the <br />"DIAL DIG" service. <br />Survey limits of Work to install silt fence. <br />Protect and maintain existing utilities that are to remain. <br />Identify existing and proposed structural foundations near excavations. Verify <br />excavation will not undermine footings or suppoRs and cause damage to <br />structures. <br />Protect plant life, lawns, and other features remaining as a portion of final <br />landscaping or interim erosion control. <br />Prutect benchmarks, property comers, horizontal control, existing structures, <br />sidewalks, railings, paving, and curbs. <br />Reference survey monuments and benchmazks, property corners, and survey <br />control points that may be disturbed by work. <br />Protect pavement or paved areas intended ro remain from damage. <br />Perform any demolition, clearing, or other work required to installing erosion <br />control. <br />Verify invert of combined sewer at point of connection for grit chamber. <br />Perform stormwater runoff testing to establish "baseline watar quality" level prior <br />to beginning of Work. <br />3.03 CONSTRUCTION <br />A. Filter Fabric Fence: Field adjust location to perimeter of clearing and stripping,. <br />L.ocation shown on Drawings is schematic. Cast all trench excavation soils from <br />fence installation to construction side of fence. Overlap 61ter fabric fence joints <br />minimum ] foot before backfilling trench. Seal joints to ensure runoff passes <br />through fabric. <br />B. Polyethylene (PE) Sheeting: <br />?, <br />Overlap joints minimum 28 inches. Overlap in direction of drainage and <br />prevent water from draining onto material being protected. <br />Secure sheeting in pl�ce to prevent movement and damage. <br />CIP No. 2-0-002•Ol 02371 - 6 Project No. MR-NM-2005-01 �2[ <br />// <br />