Laserfiche WebLink
� 728 IJIth S�reet SW. Sulte 300 <br />� � � �� Everefl, N'A 96201 <br />�zsrniaeao cF.■ e:snua9oo� <br />Date: Sept. 12, 2005 <br />To: Paul McKee <br />Project <br />File No. <br />Engineering/Public Services Dept. <br />Ciry of E•�erett <br />3200 Cedar Street <br />WA 98201 <br />TRANSMITTAL <br />From: Hugh Kuyper <br />tc: Poli Luis, POE <br />Port of Everett, l4'h St Bulkhead Project <br />242002.009.002 <br />AD1.5 Revision to Sheet C4.1 Plan <br />AD1.6 Revision to Sheet C4.2 Plan <br />ADI.7 Revision to Sheet C4.3 Plan <br />AD1.8 Revision to Sheets C4.1, C4.2 <br />I� MEMO <br />� <br />�[�C�G��IC [jJ <br />u �` 4 zao5 <br />SEP 1 <br />EnT� r.��f'�"mvc�vrP ` <br />Action Requested: <br />QNone ❑ For your Records ❑ For your Signature � For your Review and Approval <br />❑ Other. <br />Date Required: <br />Remarks: <br />Paul, <br />Attached is a copy of stortn drainage revisions to the approved drawings issued to bidders as Addendum <br />1. The changes add three 24-inch diamerer stormwater outfalls to the design. These three outfalls will be <br />the consolidated outfalls for the south basin of the North Marina Redevelopment project. When the <br />upland system is complete and functional, the existing 12-inch diameter outfalls shown on the previously <br />approved dra�vings will bc abandoncd. <br />Our objective with this change is to construct the outfalls from the bulkhead north to a point beyond the <br />esplanade improvcments, in this manner, we can connect the future storm drainage system to these three <br />outfalls �vithout damaging the new esplanade consiruction. <br />Picasc revicw this revision and pro��ide your approval. <br />Thank you. <br />