My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1410 W MARINE VIEW DR 2016-01-01 MF Import
>
Address Records
>
W MARINE VIEW DR
>
1410
>
1410 W MARINE VIEW DR 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2017 6:56:10 PM
Creation date
2/27/2017 6:21:59 AM
Metadata
Fields
Template:
Address Document
Street Name
W MARINE VIEW DR
Street Number
1410
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� 728 IJIth S�reet SW. Sulte 300 <br />� � � �� Everefl, N'A 96201 <br />�zsrniaeao cF.■ e:snua9oo� <br />Date: Sept. 12, 2005 <br />To: Paul McKee <br />Project <br />File No. <br />Engineering/Public Services Dept. <br />Ciry of E•�erett <br />3200 Cedar Street <br />WA 98201 <br />TRANSMITTAL <br />From: Hugh Kuyper <br />tc: Poli Luis, POE <br />Port of Everett, l4'h St Bulkhead Project <br />242002.009.002 <br />AD1.5 Revision to Sheet C4.1 Plan <br />AD1.6 Revision to Sheet C4.2 Plan <br />ADI.7 Revision to Sheet C4.3 Plan <br />AD1.8 Revision to Sheets C4.1, C4.2 <br />I� MEMO <br />� <br />�[�C�G��IC [jJ <br />u �` 4 zao5 <br />SEP 1 <br />EnT� r.��f'�"mvc�vrP ` <br />Action Requested: <br />QNone ❑ For your Records ❑ For your Signature � For your Review and Approval <br />❑ Other. <br />Date Required: <br />Remarks: <br />Paul, <br />Attached is a copy of stortn drainage revisions to the approved drawings issued to bidders as Addendum <br />1. The changes add three 24-inch diamerer stormwater outfalls to the design. These three outfalls will be <br />the consolidated outfalls for the south basin of the North Marina Redevelopment project. When the <br />upland system is complete and functional, the existing 12-inch diameter outfalls shown on the previously <br />approved dra�vings will bc abandoncd. <br />Our objective with this change is to construct the outfalls from the bulkhead north to a point beyond the <br />esplanade improvcments, in this manner, we can connect the future storm drainage system to these three <br />outfalls �vithout damaging the new esplanade consiruction. <br />Picasc revicw this revision and pro��ide your approval. <br />Thank you. <br />
The URL can be used to link to this page
Your browser does not support the video tag.