Laserfiche WebLink
p �, �� <br />W ! 7 <br />rc ' <br />> <br />e � � <br />� ��-o- r , - , 1 <br />;, L__--J <br />1'-6' 6' <br />1'-0' <br />4 VALVE BOX DETAIL <br />Mt.J stxc:�/s•�t._u. <br />3' PVC <br />REBAR IMBEDDED IN <br />BO% AND BULKHEAD <br />STANDARD <br />ND COVER <br />NEW BALL YALVE <br />CONLRETE VALVE BO% WITH <br />i. a ,2• 0.�. <br />VALVE <br />CONTINUOUS <br />CONCRETE TREI <br />CANGWAY <br />C�SOLINE AND � <br />FUEI dL PI%NG <br />3-1/1' % 1-5/!' <br />GALVANIZED STEEL <br />CIUNNEL SUPPORT pOLYSTYRENE - FLE%IBIE MOSE <br />WITX O.D. CUYP ROTATION <br />ANO VIBRA STRIP <br />PIPE CUSHION <br />Z ELBOW CONN. O FLEX. HOSE <br />Mt.J SGLLE:�/2•�1•_U• <br />3/B� THICK SCORIATED CALV. STL COVER <br />WITH URING HANDlES, i'RA4E, AND <br />CWNTER-SUNN SCREMS 12� O.C.E.W. <br />3/�" CONDUIt WITH CONfROL <br />�WIMN6 FROM EXISTIN6 EMERGENCY <br />SXUT-Oif PANE� <br />'LOSION PROOf <br />iSTRUCTION IN VALVE BO% <br />PVC SIEEVE <br />�- 2' GASOLINE AND /2 DIESEL <br />DOUBIE-`NALL LONTAINMENT PIPINC, <br />4'-D� SLOPE O 1% BACK TO NEW �AULT <br />5�_p• VALVE BOX WITN j4 O 12' O.C. <br />8 VAIVE BOX SECTION <br />M1.3 sauin/2'-i._o. <br />Pi1EV� <br />. P.O. BO% SSp <br />• MARf. 1YA 90i0! <br />]Y (�i0) 15Y-71M <br />5 PILOT OPERATED CONTROL VALVE BOX DETAIL <br />M1.3 SCQE:I/2'-I•_0• <br />1[4 �.7Y1 .IUiY .1�' JYR [W <br />Evadl �asniglan 98204 <br />RL �� ���-� <br />laJ <br />Mx � n � R�� <br />C <br />90' ELBOW WITH <br />FLANCE CONNECTION <br />TO FLE%IBLE HOSE <br />3-1 1' % t-'� <br />STE� CMANNE <br />CANfiWAY AND <br />9U' E180W — <br />WEID NECK <br />% CASOIINE AND NEL <br />,f OIL PIPING <br />BALL VA�VE <br />GALVAN2ED STEEL <br />PIPE CUNP <br />ilE%IBLE HOSE <br />1 ELBOW CONN. O FLEX. HOSE <br />M1.3 scx[:t/x.•t._o. <br />3 NEW VAULT PLAN <br />M1.J SCJUEI/Y•�1•_U• <br />��.. <br />+'�: <br />���� <br />�e . �:�.:.;v...:� <br />,� <br />PRE55 <br />m� <br />0. NITI <br />� <br />i. NELS <br />mK <br />�2 <br />PRTID N: <br />1" 14 <br />. � � : <br />O ELECTRICAL COND RN TO,REMAINE N PUCE <br />DURING CONSTRUCTION Of NEW NANNOLE. <br />�SNB NEW CONDUIT, 2' 6ASOt1NE AND /2 <br />DIESEL DWBIE-WALL CONTAIN4ENi %PI <br />IEVEL WIM E%ISiIN6, ALSO SFE NOTE q <br />ANO OON SHEET YI.1. <br />OLONSTRUCT NEW VAULT WI1H PoRT Of' EVERETT <br />STANDARD 2�'/ MANNOLE ANU RUNG$ OVER <br />E%1571N6 AND NEW PIPING AND CONDUIT. <br />O4 NEW 2" DUUBLE-WALL CONTAINMENT PIPING <br />AND CONDUIT SHALL BE INSTALLED PER NO7E5 <br />ON SHEET M1.1 ANO ELECTRICAL DRAWINCS. <br />OS fIELO MGSURE AND PRE-IABRICATE NEW <br />GALVANIZEO STEEL PIPE ASSEMBLY. COYPLETE <br />WITH VALVES, FITTINGS, AND SHOCN ABSORBfR. <br />OB 2' FLANGED BUTTERfLY VALVE. <br />O7 2' FUNGED TEE WITH 12" GALVANRED RISER <br />AND SHOCK �BSORBER. <br />O2� FUNGEO CHECK VALVE. <br />9OWT AND REMOVE E%ISiING PIPE AND <br />CONDUITS. SEE GENERAL NOTES ON SHEE7 <br />MI.1. <br />10 CONNECT NEW PRE-FABRICATEO ASSEMBLY AND <br />CONDUIT TO E%ISTING, ALONG WITH NOTE O <br />ON SHEET Mt.t. ALL WORN MUST BE <br />COMPLEiED IN A 2�-HOUR PERIOD, INCLUDING <br />PRESSURE TES7ING Of NEW SYSTEM. <br />11 PLUC OPENING WITH CONCRETE. <br />12 OEPTH OF NEW VAUIT WERE TANEN FROM FIELD <br />MEASUREMEHTS AT EXISTING VAUIT. ADJUST <br />THESE MEASUREMENTS AS REOUIRED PER <br />ACTUAI FIELU CONDITIONS. <br />1J SEE STRUCTURAL DRAWING SOJ FOR CONCRETE <br />AND CONCRETE REINFORCEMENT MATERIAL <br />REOUIREMENTS. AND SNEET 51.1 FOR ttPICAL <br />REIN�ORCEMENT DETIULS. <br />SCNF M FEFT <br />t 0 3 • <br />100% 3UBMITTAL <br />PORT OF EVERETT <br />14TH STREET BULKHEAD REPLACEMI <br />DETAILS <br />NOiE: _� <br />IP 1' DOES N07 wEASURE I' <br />�UIUST SGLES ACCOR0ING�Y. <br />�WG. N0. <br />M1.3 <br />av ra. <br />2-0-002-01 <br />�� MR-NM-2005-01 <br />511EET H0. S(� Of �7 <br />