Laserfiche WebLink
� EVER T ENGINEERING, � c. <br />1�t0 NO�TON ��� <br />[VLRIIT. WAfNIFpTON ql01 li1J117 <br />�u1y 15, 1980 <br />City of Everett <br />Building Permit Departaent <br />Everett� WA 98201 <br />Ikar Sir: <br />�e follaring is a recap of the actual costs and quoted costs for <br />installatiari of the new 60' X 120' building additicn to the Evenett <br />FYi�neering� Inc. facility: <br />Kirby Building System (includes delivery to site) -- $14�000.00 <br />B�lding fomdatiari and floor slab (incl. Lubor) -- 15�000.00 <br />Additicnal fabricated col�s and crane rails� <br />including labor ------------ 6�5�.00 <br />Metal siding and ptslins inc11��11n$ access doors� <br />labor included ---------- 15�500.00 <br />Flectrieal servlce (building service including <br />� ll0 v. transformer rnly) ------ 3�5�•� <br />Catch basins and 8" stoxm drain system ------------ 2�200.00 <br />Parldng striping an�' landscaping ----------------- 2,300.00 <br />mrt� casTs: $59,000.00 <br />since��y, � ���� <br />: <br />�� CQGq � <br />naa x. r�t� <br />President <br />VI✓� <br />CC: V. Ltndberg� L.E:C. Ehgineering <br />