Laserfiche WebLink
�� <br />� <br />PAGE 2 <br />14;36 LOGIC 5000 ASHRAE CLTD LOAD CALCULATION 3/19/96 <br />AREA BTUH BTUH BTUH <br />SqFt Sen Loae Sen Gain Lat Gain <br />------------------------------- <br />CFM needed to satisfy loed 2�597 CFM <br />Ventilation (outside eir) 810 CFM 44�550 0 0 <br />Humidification Load lb Gal/Day 5�496 <br />Rou�n Equipment Load <br />STRUCTURE SUMMARY <br />Space Losd <br />Ventilation (outside air) Load <br />Hu�idification Load 15 Gal/Day <br />Structure Equipment Load <br />184�306 52,346 26�325 <br />3,844 114,260 <br />44�SS0 <br />5,496 <br />164�306 <br />------------------------------------------------- <br />NOMINAL COOLING CAPACITY NEEDED IS 8.8 TONS <br />(Based on a 0.75 ::enaiLie/total load ratio.) <br />------------------------------------------------- <br />52�346 26�525 <br />0 0 <br />52�346 26�325 <br />#*+�** LOGIC b000 VERSION C91.04 *�ts* <br />THE LOAD CALCULATION WAS PERFORMED ACCORDING TO THE 1985 ASHRAE CLTD METHOD. <br />NO WARRANTY� EITHER EXPRESSED OR IMPLIED IS GIVEN WITH RESPECT TO THE <br />ACCURACY OR SUFFICIENCY OF THE IIVFORMATION PROVIDED� pND THE USER MUST <br />ASSUME ALL BISKS AND RESPONSIBILITIES IN CONNECTION WITH ITS USE THEREOF. <br />