My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1620 W MARINE VIEW DR 2018-01-02 MF Import
>
Address Records
>
W MARINE VIEW DR
>
1620
>
1620 W MARINE VIEW DR 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2022 10:18:25 AM
Creation date
2/27/2017 6:24:42 AM
Metadata
Fields
Template:
Address Document
Street Name
W MARINE VIEW DR
Street Number
1620
Notes
PED BRIDGE IS UNDER 1610 W.M.V.D.
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
fll_IG- Sq:l�_ IP: Y OF EOERETT FLQI TER IJn:2C - Sa-3^42 ffIfT PM <br />t <br />t ( _ <br />FINDINGS AND DECISION <br />OF THE HEARING EXAMINER Or THE <br />CITY OF EVERET r <br />IN THE MATTER OF THE APPLICATION OF <br />THE PORT OF EVERETT FOR APPROVAL <br />OF A SHORELINE MANAGEMENT SUBSTANTIAL <br />DEVELOPMENT PERMIT SMA f16-94 <br />DECISION: The Shoreline Management Substantial Development <br />Permit Is granted subject to conditions listed. <br />TRQd IVI;TL0 <br />The Port of Everett, P.O. Box 538, Everett, Washington 98206, (hereinafter referred to as <br />Applicant) requested approval of a Shoreline Management Substantial Development <br />Permit (Shoreline Permit) for the development of a project along the City of Everetfs <br />waterfront. The project is located on the west side of West Marine View Drive, north of <br />18th Street (southeast corner of marina). The project consists of approximately 5.5 acres <br />and will be a public/private proposal which will complete an access link between the north <br />and south sides of the Port of Everett Marina and construction of commercial development <br />framing the historic Chamber of Commerce building ano the southeast comer of the marine <br />The proposed project will include: <br />Existing south marina edge improvements, Including the <br />pedestrian walkway, railing, landscaping, overlooks and <br />street furniture, will be extended to complete the south <br />and east edges of the marina. At the southeast corner of <br />the marina, the walkway will span across the corner of <br />the marine and will include a "sea fountain" or other <br />visual element. The overlooks will be similar to the <br />moorage access points that extend out over the <br />bulkhead on the south edge of the marina <br />A new pier, intended to servo the giilnet fishermen, is <br />proposed to be located at the southeast corner of the <br />marina. The pier will facilitate net handling between <br />vehicles and the oxisting not repair float or a fishing <br />twat <br />A new transient moorage float is proposed along the <br />eastern edge of the marina for use by fishermen, <br />recreational boaters, charter operators, or others as <br />appropriate <br />
The URL can be used to link to this page
Your browser does not support the video tag.