My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1620 W MARINE VIEW DR 2018-01-02 MF Import
>
Address Records
>
W MARINE VIEW DR
>
1620
>
1620 W MARINE VIEW DR 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2022 10:18:25 AM
Creation date
2/27/2017 6:24:42 AM
Metadata
Fields
Template:
Address Document
Street Name
W MARINE VIEW DR
Street Number
1620
Notes
PED BRIDGE IS UNDER 1610 W.M.V.D.
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Public Works Department <br />lh LS �►/ U Itttes Division, 3200 Cedar Street <br />COST ESTIMATE SPrET Everett, Washington 98201 <br />OCT - 3 1997 `- (425) 257-8800 <br />CITY OF EVERET7- Date Paid <br />ReCG1Pt N Public Works Dept. <br />Cost of Work Order Work Order Al <br />X Cost of Service Order S1,877.00 Service Order k 9s4 Z— <br />Contact Person C. Osolin Telephone # 206-223-1361 <br />Requested By Kirk Brooks Date of Request 9-23-97 <br />Property Owner (name) C! Ebert <br />Charge Cost to (name if different than owner) <br />Address City Zip <br />Installation Location _ 1620 W Marine View Or <br />Installation typc/description/size/etc. 6" fire service. Expose existing 8", install 8x6 reducer, 6"- 45' ell and thrust <br />block. Remove DCDA after purity, make final connection, install remote read DCDA meter. _ <br />Is <br />The following estimate is based upon the Utilities Division providing all labor, equipment, materials, <br />restoration, and final hook-up. <br />The following estimate is based upon the Street Division, work group providing all labor, equipment, <br />materials and restoration to property. <br />Please uotifv the City of Everett Utilities Division 10 wo king days in advance of required installation date to <br />allow for scheduling and parts procurement <br />Whenever the estimated cost is not sufficient to cover the total expense for labor, material, equipment rental and <br />administrative costs, the deficit shall be charged to the property for which such installation was made and the owner <br />thereof, and provided further, that any excess payment shall be returned to the person applying for the installation. <br />r vrfNS Z EAZ'� 7' <br />Itemized Cost Estimate: � CDT LE, )t <br />r5 Grp" JJ <br />�6A /,. /2�' cc: Bldg. Permit Center <br />�, ,�3 � Clair Olivers <br />Labor &Benefits 864.00 Tom Thetford <br />Material 669.00 Kirk Brooks <br />Gordon Witcher <br />Equipment Rental 344.00 Dan Lowell <br />Stan Mitchell <br />Surface Restoration --- Paul McKee <br />S1,877.00 Gerry' Crum <br />TOTAL -�= , <br />7 9C, cri <br />lrtau� a?1Lvz cep vrd C!/ylotr �cc� - �7 00 <br />Prepared by: Gerry Crum Date Est. <br />Accepted by; - ' �� •�%� �'�— Prepared: Representing: l✓n��Y� �� ✓ G G <br />10-3-97 <br />COSTAGSO LCOSAnIL}IS�w'1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.