Laserfiche WebLink
Total Utility Maintenance Management System <br />11/04/1996 Page 2 <br />Date Range :01/09/1989 - 10/28/1996 <br />CM Work Order Range :1001091070001 - UT2600-02- Pattern :7101196649057 <br />Item Range :<Blank> - WN22020001 Pattern :* <br />Program ALL Function ALL Activity ALL <br />CM WORK ORDER ID: 7101196649057 (continued) <br />PIPE38060947 <br />PIPE 2" POLY C.T.S. <br />09/19/1996 <br />12 <br />12.48 <br />PLUG36102347 <br />PLUG 1" BRASS NPT ^ <br />09/13/1996 <br />1 <br />1.12 <br />SADD42015647 <br />SERVICE SADDLE 4" W/2" IP DBL <br />09/13/1996 <br />1 <br />19.04 <br />SETT36033547 <br />SETTER COP 1" (H15") <br />OQ/19/1996 <br />1 <br />94.75 <br />VALV38034348 <br />VALVE GATE 2" SUPER HEAVY DUTY <br />09/13/1996 <br />1 <br />91.49 <br />Total Material Cost: <br />844.24, <br />Vehicles: <br />ID <br />Description <br />Hours <br />---------------- <br />Cost <br />------------ <br />V2117 <br />------------------------------ <br />91 CHEV 1-TON HYD UNIT <br />6.00 <br />33.60 <br />V2119 <br />91 CHEV 5 YD <br />6.00 <br />68.40 <br />V2141 <br />87 CHEV 1 TON W/CRANE <br />3.00 <br />15.30 <br />VH0002 <br />1993 VACTOR <br />1.00 <br />51.20 <br />VH0003 <br />94 CAT BACKHOE <br />9.00 <br />251.10 <br />VJ0019 <br />'96 FORD 1 TON <br />1.00 <br />6.10 <br />Total Vehicle Cost: <br />425.70 <br />Work Description: <br />---------------------------------------------------------------------- <br />IRRIGATION <br />ORIGINALLY CHARGED 260 FOR 2" METER. WHEN COMPLETE SERVICE NEEDED FOR <br />IRRIGATION A 1" WAS PROVIDED. <br />EXTRA $225.00 DEPOSITED TO MAKE A 2" TAP TO ALLOW UPGRADE AT LATER DATE <br />METER #47261277 (ONE INCH) <br />Total cost for work order 7101196649057: 1661.96 <br />