Laserfiche WebLink
MEMBER: AMEtMCAN KKStITUTE OF ARCINTECTS <br />C_ <br />Jeff McFall <br />Associate Engineer - Building <br />City of Everett <br />3200 Cedar Street <br />Everett, WA 98201 <br />Dear Jeff: <br />B. CRAIG THOMPSON <br />K. JOHN JONES <br />A. GARY O'LEARY <br />JOEL O. NIEMI <br />March 18, 1996 <br />RE: Plan Check Response <br />Plan Check #851042 <br />95-030 <br />We have revised the drawings in response to your plan check comments dated March 7, <br />1996. The revisions arc as follows: <br />1. Brace detail for partial height walls - Drawing A2.1 has been revised to show brace <br />locations on the floor plan indicated by Note 29 and a new detail 3/A2.1. <br />2. For a hard non -absorbent surface on walls adjacent to toilets, we have revised finish <br />schedule and interiors elevations of toilet rooms on Drawing A2.2 to show a plastic <br />laminant wainscot at 4'-0" height. <br />3. The base material at the toilet rooms will be a 6" ceramic tile. We have revised the <br />finish schedule on Drawing A2.2 to indicate this. <br />4. Have noted on detail 4/A2.2 that all re -lights are to have safety glazing. <br />Should you have any additional questions, please contact our office. <br />Sincer <br />Thomas M. Tredway <br />TMT/nrm <br />Attachments - 2 sets of drawings <br />file/routing <br />o C�C�f�Odf� D <br />MR 181996 <br />CITY OF EVERETT <br />111* Rwnw G9w1W <br />400 FIRST NATIONAL BANK BUILDING 1602 HEWITT AVENUE EVERETT, WA 98201 206 259 3161 FAX 206-621-1831 <br />