My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1716 W MARINE VIEW DR BASE FILE 2018-01-02 MF Import
>
Address Records
>
W MARINE VIEW DR
>
1716
>
BASE FILE
>
1716 W MARINE VIEW DR BASE FILE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2022 10:52:08 AM
Creation date
2/27/2017 6:25:38 AM
Metadata
Fields
Template:
Address Document
Street Name
W MARINE VIEW DR
Street Number
1716
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
233
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Enginren <br />P7amtrrs <br />sunvrn; <br />September 15, 1995 <br />File No. 24-93-016-006-01 Reid Middleton, Inc. <br />1903133rd Ave. W. <br />Suite 301 <br />Mr. Kirk Brooks 110. Box 608 <br />City of Everett Lynnwood, WA <br />Public Services Division <br />3200 Cedar Street 9so3aa3s <br />Everett, WA 98201 <br />Phone 205 775-3433 <br />Subject: Port of Everett Southeast Marina Project FAX 206775-3439 <br />Dear Kirk, <br />Enclosed are calcull:'ions regarding the question, dated July 6, 1995, from Dan Mathias regarding <br />potential additional flows from The Landing project (formerly called the Southeast Marina <br />project). <br />In summary, the peak flow from a 6-month, 24-hour storm, is 1.52 cubic feet per second (cfs). <br />This peak flow would occur for a short duration (10 minutes according to the model), with the <br />average flow over the 24-hour storm period being 0.32 cfs. Stormwater regulations require this <br />peak be treated prior to discharge to surface waters. For this project, "treatment" is diverting the <br />flow to the sanitary sewer. <br />During a 2-year, 24-hour storm, the 10-minute peak would increase to 2.38 cfs (0.86 cfs more <br />than the 6-month peak), with the 24-hour average being 0.50 cfs. <br />In normal conditions most of the 2-year storm flow in excess of the 6-month storm peak <br />(1.52 cfs) will bypass the sewer connection and discharge directly to the existing outfall in the <br />marina. On an occasion when a higher tide occurs at the same time as the peak of a 2-year, <br />24-hour storm, the bypass of the 2-year, 24-hour storm will be less. Statistically, this is expected <br />to happen once every 16 years. The peak flow during this event to the sanitary sewer would be <br />2.38 cfs (the entire 2-year, 24-hour peak). <br />This should answer the question and allow the drawings to be approved. Please call me if you <br />have any additional questions. <br />Sincerely, <br />REID MIDDLETON, INC. <br />Pa A MA <br />Robert O. Galteland, P.E. <br />Project Engineer <br />vlt\wt\evt\semarina\,alcltr.rog { D <br />Enclosure II r L Lt 1 D <br />U SEP 15 1995 <br />CITY OF EVERETT <br />Bldg. Permit Counter <br />
The URL can be used to link to this page
Your browser does not support the video tag.