My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1716 W MARINE VIEW DR BASE FILE 2018-01-02 MF Import
>
Address Records
>
W MARINE VIEW DR
>
1716
>
BASE FILE
>
1716 W MARINE VIEW DR BASE FILE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2022 10:52:08 AM
Creation date
2/27/2017 6:25:38 AM
Metadata
Fields
Template:
Address Document
Street Name
W MARINE VIEW DR
Street Number
1716
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
233
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INTRODUCTION <br />This project includes development of a new commercial retail building on approximately <br />3.4 acres near the southeast comer of the Port of Everett Marina. Future development plans <br />for the site include a hotel and a cotrunercial building as well as a farmer's market and public <br />waterfront boardwalk. The site is located between 14th Street and 18th Street along West <br />Marine View Drive. <br />The site is bordered by the existing South Marina parking lot to the west, 18th Street to the <br />south, West Marine View Drive to the east, and the marina to the northwest. The Everett <br />Chamber of Commerce building is located in the southeast corner of the site. <br />` The undeveloped parcel is currently compacted gravel and fill, with some paving and <br />I landscaping surrounding the existing Chamber Building. The proposed commercial <br />building will cover approximately 10,000 square feet. The proposed future hotel and <br />commercial building will cover approximately 10,000 and 4,000 square feet respectively. In <br />addition to these buildings, a public boardwalk, open market, landscaping, a sidewalk along <br />Marine View Drive, and other amenities are included as part of the complete project. <br />I Through an agreement between the Port of Everett and the city of Everett, 6-month, 24-hour <br />storm events from the entire newly developed 3.4 acre site, as well as runoff from the <br />existing Chamber of Commerce s,te and a portion of the existing South Marina parking lot, <br />Iwill be diverted to the City of Everett sanitary sewer system. <br />
The URL can be used to link to this page
Your browser does not support the video tag.