Laserfiche WebLink
DESIGN CRITERIA <br />1 <br />Jurisdiction: <br />• City of Everett - 1993 Design and Construction Standards and Specifications, <br />' Rev. July 1994. <br />• Department of Fisheries. <br />IMethod of Calculation: <br />• SBUH <br />I. Design Criteria: <br />• Detention: not required, discharge to Snohomish River. <br />' • Water quality treatment for developed 6-month, 24-hour storm for new development. <br />Special Design Criteria: <br />• To improve water quality in the marina, stormwater runoff from a portion of the <br />existing Marina Village and South Marina Parking lots will be routed into the <br />city -owned sanitary sewer system. The portion routed to the city sanitary sewer <br />system will be the design storm for the existing site which is 6-month, 24-hour storm. <br />I <br />!. <br />I <br />I <br />I <br />