Laserfiche WebLink
The Koll Company <br />April 23, 1984 <br />Page Two • <br />No work is to commence on the electrical, mechanical or plumbing phases <br />of the project until such time as the permits h�ve been obtained by <br />the respective subcontractors. <br />In order to expedite the process it is requested that 24 hours notice <br />be given prior to obtaining cne permlts for the shell of the structures. <br />If there are any further questions or concerns do not hesitate to contact <br />this office. <br />Resp tfully, <br />L N. Ca lahan <br />Buildi Director <br />LNC:stg <br />— ..r-: c—.—: _ —_ �. - — <br />� <br />(���.��� �� <br />Y <br />� <br />H 1- <br />y r. <br />ri �. <br />� � <br />� � <br />� E <br />� �. <br />b: <br />�_ <br />�y :. <br />C; <br />ra � <br />�c <br />OS <br />�c <br />r <br />r <br />�. <br />Ci <br />y <br />