Laserfiche WebLink
��� <br />��x <br />C H <br />>H5� <br />yxH <br />K C] <br />H� <br />"�+7H� <br />V1 H <br />t70� <br />H t7 <br />H/�8 <br />M]Y �] <br />9H� <br />4 <br />t t-� H <br />8 `� <br />H <br />C'� C7 � <br />��M <br />HOcyi� <br />� � ( <br />'� ... <br />..,. ,.►� <br />Paye Two. <br />11. Walls and First Floor to have R19 insulation, coof <br />R-38. <br />12. Chanye the number of risers and tceads for 7" max. <br />height. <br />13. Install 18" of non combustable material at the top <br />facing the roof on the north and south. <br />14. Provide overflow drains at roof drains pec UBC. <br />15. Deck joist and deckiny to be pressuce tr�a[ed. <br />, 16. Detail 9 AS to be 1z" clear from bottom of rail to <br />isupport. <br />17. Use 2 x 10's at 12" on centec at Room 10�8, Hall i01 <br />and Hall 201. <br />18. Make doors 41 and 45 one-hour labeled in lieu of <br />20 minute. <br />II 19. Add one-hour wallboard outside Room 112 (unpainted). <br />� SincereLy, <br />Robert W. Champion,. AIA <br />RWC:ss <br />F.nclosure <br />Robert W. Champion, Architect A.I.A. <br />