My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1922 W MARINE VIEW DR 2016-01-01 MF Import
>
Address Records
>
W MARINE VIEW DR
>
1922
>
1922 W MARINE VIEW DR 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2017 9:53:30 PM
Creation date
2/27/2017 6:29:30 AM
Metadata
Fields
Template:
Address Document
Street Name
W MARINE VIEW DR
Street Number
1922
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. <br />1972 April <br />CHRONOLOGY OF PAST <br />PERMIT ACTIVITY ON NORTON <br />MARINE TERMINAL AND BOAT HARBOR <br />EXPAid S I ON <br />Initial Draft �IS on Wood chip Flcility and <br />Boat Harbor E�;pansion <br />2. 1972 October Shoreline Permit issued only for Wood chip <br />Facility and reservation of 16 acres of <br />uplands for future marina project. <br />3. 1973 October Shoreline Permit amended; <br />1976 December marina space still reserved. <br />4. <br />5 <br />1977 March Shoreline Permit issued for Kaiser Project, <br />including the Everett Plywood property. <br />Marina space was still reserved. <br />1977 September Shoreline Permit application made for <br />marina portion of Norton Avenue Marine <br />Terminal <br />RELEVANT CONDITIONS FROM PREVIOUS PERMITS <br />1972 permit• Wood Chip Facili`v and Space for the Marina. <br />4. There shall LA extensive landscaping of the marine terminal <br />and future boa.t harbor area to include the following areas: <br />a. along Norton Avenue, the east end of the project, <br />b, along the 15 foot berm separating the terminal <br />activity from the future boat harbor. <br />c, The use of the top of the berm for a path and observa- <br />tion point is also recommended. <br />6. That a pedestrian circulation element be included as an <br />integral part of the Port of Everett development in this <br />area, to link the three public oriented projects planned; <br />the boat launchir.g facility, the new boat harbor, and <br />continued development of the 14th Street Mari.na. <br />1977 qermit: Kaiser Facility <br />A. Prior to construction permits being issued for buildings, <br />a landscaping plan shall be developed addressing the follow- <br />ing areas: <br />a. parking areas, <br />b. boundary between the assembly area and the proposed <br />marina, <br />c. along the west edge of Norton Avenue trom 16th Street <br />to 21st Street. <br />5. Development of a pedestrian and bike path by the applicant <br />along the west edge of Norton Avenue between 16th Street <br />and 21st Street. . <br />axxzBrr s <br />pAST PFRMIT e1CTZVITY SUPiMARY <br />
The URL can be used to link to this page
Your browser does not support the video tag.