My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1922 W MARINE VIEW DR 2016-01-01 MF Import
>
Address Records
>
W MARINE VIEW DR
>
1922
>
1922 W MARINE VIEW DR 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2017 9:53:30 PM
Creation date
2/27/2017 6:29:30 AM
Metadata
Fields
Template:
Address Document
Street Name
W MARINE VIEW DR
Street Number
1922
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PLANNING COMh1IS5ION REPORT TO CITY COUNGL <br />SMA ft3-8i <br />Parsons Constructors,lnc. <br />August l2, 1981 <br />WHEREAS, there was submitted to the City of Everett as follows: <br />.Applitant: <br />Relationship to Property: <br />Requested Action: <br />Location: <br />Size: <br />Project: <br />Existing Zoning/5horeline <br />1Aaster Program Designation: <br />Parsons Constructors,Inc. <br />P.O. Box 7036 <br />Pasadena, CA 911bi <br />Lessee <br />Shoreline Substantial Development Permit <br />Norton Narine Terminal, <br />I900 Norton, north ot 2Is2 Street, <br />west ot Norton <br />60 acres <br />To construct facilities [or assembly of <br />modules tor gas tonditioning units [o be <br />shipped by barge :o Prudhoe Bay, Alaska. <br />The assembled modules (some weighing <br />2000 tons) with typical dimensions ot 30 by <br />I50 feet with a typical height of SO feet. <br />The minimum height is l6 [eet and the <br />normal maximum height is !00 teet. (See <br />Exhibi2 3 3 a, "CloseuP ot Module" and <br />'Typical 1�tod�le fabrication Site".) <br />Refahricated materials, inUuding <br />structural steel, piping, veuels, pumns. <br />motors, and electrical equipment would be <br />shipped in 6y rail, road, and sea tor <br />assembly at the site. Approximately <br />l 13,000 cuhic yards will be excava:ed south <br />of Ne existing co�cr^te pier on Ne site to <br />create a dead load Sarge bazin.. The <br />excavated material will be used to increase <br />the level ot till on other portians ot the <br />site. <br />Peak employment could be up to 1,600 <br />workers, most ot whom are currently <br />housed in the Everett vicinity. ?he <br />average work force will be 773 employees, <br />and traffic generated [rom :hese <br />employees is expected to be u�5 vehicles <br />per day. Car pooling will 5e encouraged <br />and 50.pazsenger buses will he avaiiable [o <br />hdp minimize tratfic. Additional tratfic <br />expected would be thrre large trucks and <br />six small trucks in and out per day. <br />11-1/Ilrban Developed <br />
The URL can be used to link to this page
Your browser does not support the video tag.