My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1922 W MARINE VIEW DR 2016-01-01 MF Import
>
Address Records
>
W MARINE VIEW DR
>
1922
>
1922 W MARINE VIEW DR 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2017 9:53:30 PM
Creation date
2/27/2017 6:29:30 AM
Metadata
Fields
Template:
Address Document
Street Name
W MARINE VIEW DR
Street Number
1922
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
As-builts o[ storm sewer� sanitary sewer, and water systems will be required to bc <br />submitted per the following schedule: <br />Water as-builts must te in the torm of the original stamped mylar and shall <br />be submitted with easements as required within 30 days o[ connection (tailure <br />te submit watcr as-builts as noted will result in a"Stop-Work Order" being <br />issued on projett). <br />Storm and sanitary sewer systerns can be submitted as prints and must be <br />su6mitted prior to ' <br />A one-ycar Warrantee Bond as rcquired on thc pu6lic utilities shall be for an <br />amount not less than l0% of the cnst ot construciion and shall run tor one <br />year trom the date o[ issuance ot ;h�, ii: st Ottupancy Permit for ehc projett. <br />" 10. <br />l l. Tha[ during construction, aIl truck tratfic to and trom the site within the City of <br />Everett shall 6e on arterial streets unless otherwise approved by thc Public Works <br />Department. <br />l2. That participation in the cost �o tund the waterfronc intercep[or is required. The <br />appro>:imate cost based on the preliminacy intormation provided is 5.0162, per sa. <br />tt. ot warehouse and $•I62 per sq. tt. o( otfice. The actual cost shall be computed <br />by the Building Department per the ordinance in eftect at the time and according <br />to the inforrration provided on the approved plans on the date o( permi[ issuance. <br />13. That a preconstruction conference between applicant, Planning Department and <br />PubliC Works Department may be required prior to approval o( Pub1iC Works <br />Permit. <br />14. That stormwater runo[[ should 6e conveycd to the Snohomish River Channel rather <br />than to the City's combined sewer system. A baftle-type oil separaror mus[ be <br />provided. <br />I5. That sanit�ry systems must be extended to the site from existing public system. <br />16. That wa[er system must be extended to the site trom existing puhlic system. <br />-6- <br />
The URL can be used to link to this page
Your browser does not support the video tag.