Laserfiche WebLink
As-builts o[ storm sewer� sanitary sewer, and water systems will be required to bc <br />submitted per the following schedule: <br />Water as-builts must te in the torm of the original stamped mylar and shall <br />be submitted with easements as required within 30 days o[ connection (tailure <br />te submit watcr as-builts as noted will result in a"Stop-Work Order" being <br />issued on projett). <br />Storm and sanitary sewer systerns can be submitted as prints and must be <br />su6mitted prior to ' <br />A one-ycar Warrantee Bond as rcquired on thc pu6lic utilities shall be for an <br />amount not less than l0% of the cnst ot construciion and shall run tor one <br />year trom the date o[ issuance ot ;h�, ii: st Ottupancy Permit for ehc projett. <br />" 10. <br />l l. Tha[ during construction, aIl truck tratfic to and trom the site within the City of <br />Everett shall 6e on arterial streets unless otherwise approved by thc Public Works <br />Department. <br />l2. That participation in the cost �o tund the waterfronc intercep[or is required. The <br />appro>:imate cost based on the preliminacy intormation provided is 5.0162, per sa. <br />tt. ot warehouse and $•I62 per sq. tt. o( otfice. The actual cost shall be computed <br />by the Building Department per the ordinance in eftect at the time and according <br />to the inforrration provided on the approved plans on the date o( permi[ issuance. <br />13. That a preconstruction conference between applicant, Planning Department and <br />PubliC Works Department may be required prior to approval o( Pub1iC Works <br />Permit. <br />14. That stormwater runo[[ should 6e conveycd to the Snohomish River Channel rather <br />than to the City's combined sewer system. A baftle-type oil separaror mus[ be <br />provided. <br />I5. That sanit�ry systems must be extended to the site from existing public system. <br />16. That wa[er system must be extended to the site trom existing puhlic system. <br />-6- <br />