Laserfiche WebLink
G [�y' M <br />� 7 H <br />ip b 5 <br />C M <br />7 H N <br />K � n <br />o m o <br />�q N �q <br />N M <br />� H � <br />ano <br />�`�R <br />b H l�zC <br />r� <br />H H <br />N <br />O cn <br />��0era <br />H O N <br />� �ubilc Utillty 01str!ct No. 1 <br />i of Snohoml5h County <br />:verett, Nashington 982�1 <br />�.� <br />3. <br />� <br />j �3_, t_'-i : <br />' i i � '1 11�_ �:J � <br />I1.- <br />i �i . _. <br />Technlcai Speclflcatlon No. 1310 <br />February 7, ��90 <br />Page 34. of 164 , <br />/ / from <br />e Reports of tests def.Fned 1n Section 7•2•A <br />manufacturer.��' <br />Qua11f1catl s of�� 9ea"emhrane lnstailer, includin9: <br />anel layout <br />a <br />c <br />q draWt 9 shouln9 the Installatlon plcable) and <br />ldent�"€Y��9 oth fabwellteas`�anypp`+arlance or <br />�_� d seams, as whlch devlate from the <br />,�ddltfonal det �S 7he layou�an and�shabl <br />englneoring draw s. <br />adequate for use as con1srue{con p <br />tnclude dlmenslons, de <br />Rosume of the Seamer to e a�ssl9auratlor, th�f <br />�����d��g dates <br />project, <br />emploYment. <br />bead is <br />Certlflcatlon that the extrudae�embrane. <br />f the same resln as the g <br />made o <br />d Equlpment 11st deflning f1e1d seamin9 equlpment_ <br />�-"` � <br />by quantlty and type•� �— — <br />'�.� �•z �'ATE---RI-A�S labor, matertal and <br />�` � A. The CONTRACTOR shail furnlsh all <br />eQ�tpment to construct and i�stall the o11 contat�ment system. <br />� ..,�„�1 <br />( 'oI <br />G8406C <br />«.•+rr• ' <br />g, HIGH DENSI'fY PO�YETHYLENi RESIN new, flrst <br />olyethylene (NDPE) resin shall be ounded <br />H1gh densltY p roducnd 1n the United States and �orodutln9 <br />quaiity material p Q��fitally Por the P�rPOSe °f p e and <br />and manufactured sp <br />HDPE geomembranes. A11 reslns shall be of the same yP <br />no batch shall be blended With Ye�Y��SSe 'f'`dttons: <br />NDPE re51ns sha11 meet the following p IREMENT <br />TES? <br />Speclftc Gravlty <br />Nelt Index <br />Low Temperature <br />Rr1it12f1CSS <br />TESi DE� <br />ASiM G '192-fi6 <br />Method A <br />ASTM D 1238'85 <br />Condltlon E <br />AS7M 0 746••79 <br />Procedure B <br />RE,�-- <br />0.935 to 0.95 <br />pe�- 10 minutes <br />minus 4��F <br />