Laserfiche WebLink
Page z <br />Work AcNvity Work Order ob,ll�zooz 9:50 <br />Work Order Number 20020553 <br />EQUIPMENT: <br />ID DESCRIPTION Date Unfts Cost <br />MATERIAL: <br />ID <br />CAP044307447 <br />CEME00061438 <br />COUP44300147 <br />COUP46300547 <br />ELL044303447 <br />PIPE44304247 <br />PIPE46304347 <br />TEE046304047 <br />MISCELLANEOUS: <br />ID <br />DESCRIPTION <br />CAP 6 GASKEfED PVC SEWER <br />CEMENT 20 MINUTE SEf 50 LB. BA <br />COUPLING 6 CONCREfE X 6 CM <br />COUPLING 8 CLAY X 8 CVPLASTIC <br />ELBOW 6 BELL X SPIGOT 45 DEG P <br />PIPE 6 PVC SEWER ASTMD,�034 BO <br />PIPE e PVC SEWER ASTMD-3034 80 <br />TEEeBELLX88ELLX6BELLP <br />DESCRIPTION <br />Sub Total <br />Date <br />04/03/2002 <br />04I0312002 <br />04l03I2002 <br />04l03I2002 <br />04/03/2002 <br />04l03l2002 <br />04I032002 <br />03/2B/2002 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />13.00 <br />4.00 <br />2.00 <br />Sub Total <br />Date Units <br />Sub Total <br />Cost <br />52.75 <br />311.84 <br />55.40 <br />58.52 <br />53.97 <br />513.52 <br />a�.sz <br />E27.27 <br />t81.19 <br />Cost <br />so.00 <br />