Laserfiche WebLink
nlarch 4� 19n5 <br />; � �; j Y`, � <-� ` <br />-- .-t�� / <br />�-; L.' ' " <br />.�' <br />Mr Edward A Glasgow <br />E A Idord Cnm�am <br />� horton <br />Everett� Washinqton <br />Dear Sir: <br />At the time the new kiln instelln{ion wrs made� �ndustrial Electric <br />of Evereti installed a new tranamieeion line to aervice tvro buildinQe. <br />Mr. Patchett told me the permit and feea uvuld be taken care of by <br />the E A Nord CompAny. To date we have n�t received a request for <br />inspection nor haa the permit been issued. <br />At the time of one of the inspections of the wiring of the kiln� <br />I called for corrections to be m3de on an air compressor tha Nord <br />Company wes installing. �e have not been called for a re—inspection <br />nor notified of the corrections being made. <br />Would you please give this your personal attention. <br />LJD:rm <br />Yours truly <br />L J. Dougherty <br />Electricel Inspector <br />�'� l� (L, �7 ��i/ , <br />�=_:? ��/ ll ll <br />