Laserfiche WebLink
Summary <br />City of Evere�t Public Serviees <br />Status Review: Permits & Inspections for 3010 W Marinie View Dr <br />as of 111512013 <br />3010 W MARINE VIEW <br />BO501-031 Issued: <br />PW0501-07J Issued: <br />U0509-003 Issucd: <br />D0509�003 Issued: <br />E0509-063 Issuud: <br />U0509-007 Issucd: <br />X0606-004 Issued: <br />E0607-061 Issued: <br />K0607-003 Issued: <br />E0607-139 Issucd: <br />9123l05 Status: FINALED <br />9123105 Stalus: FINALED <br />9123/OS Slatus: FINALED <br />9/23/OS Status: FINALED <br />9I23105 Slatus: <br />9/23/OS Status: FINALED <br />6120106 Status: fINALED <br />7/13�06 StaWs: FINALED <br />7I11106 StaWs: PERMIT ISSD <br />7I25I06 Status: FINALED <br />InspectionTvpe Date <br />3010 W MARINE VIEW <br />Permit: B0501-031 Status: FINALED <br />Description: NEW 4-PLEX <br />NoteslConditions: <br />Expires <br />Ezpires <br />Ezpires <br />Expires <br />Expires 3/27/O6 <br />Ezpires <br />Expires <br />Expires <br />Expires 7/7/0"/ <br />Ezpires <br />ResW[ <br />Issued: 9/2310� <br />Footing 11/4/05 Approval <br />TMB Approval as noled: <br />Clean slough soil prior to concrete placement. <br />Foundation <br />MWH <br />StructSlab <br />TMB <br />11/22105 Approval <br />12/20/OS Approval <br />rtemai ns <br />NEW 4-PLEX <br />NEW 4-PLEX <br />NEW 4-PLEX <br />DEMOL�SH HOUSE & GARAGE <br />TEMPORARYPOWER <br />SEWER CAP-OFF <br />PLBG 8 MECH FOR 4-PLEX <br />WIRE NEW 4-PLEX <br />SPRINKLER FOR NEW 4-PLEX <br />FIRE ALARM - NEW 4-PLEX <br />Finated:l/3l07 <br />See notes <br />Parking 2rea <br />Consultation 617I06 Approval Nailing, See notes <br />TMB Complele drywall nailing & shear nailing & holddowns & straps. <br />DrywallNailing <br />TMB <br />6/7106 Approva� <br />ShearNailing 6/9/06 Approval See notes <br />TMB APP�o�ed as noted: Nail off straps as discussed. <br />To Records: <br />Framing 8I16106 PtAppr-CorrReqc See notes <br />TMEi 11 Provide firestopping at floor joist to wall conneclion in parking garage. <br />2) Nail oft column connectors al porches. <br />3) Provide subfraining at be�m wrap to shorlen gyp wall board spacing 8 frame columns in per plan <br />4) Correct to slairway risers at the boltom steps at 2nd floor -- 4 units involved. <br />5) OK to insulate. <br />Framiny 8122106 Approvai See notes <br />TMB ApP�oval as noted: Protect 5re sprinkler system from freezing as discussed. <br />5\t�11v1cleod\Crystai\InspeclionRecords 3010 W Marine View Dcrpt 11/512013 Page 1 of 4 <br />