Laserfiche WebLink
INSPECTION REPORT <br />Date,2-09-e �ermit: &7D2 _D� <br />Contractor: <br />14/7) Owner: �^ <br />Site Address:�15()/ <br />ELECTRICAL <br />[j Temp Service <br />❑ Grcundwork <br />❑ SlablConduit <br />]Rough In <br />❑ Service <br />❑ Grounding <br />❑ Ceiling Grid <br />❑ Electrical Final <br />SITE WORK <br />❑ Footing drains <br />I I Roof drains <br />TYPE OF INSPECTION REOUESTED <br />BUILDING <br />MECHANICAL <br />❑LIFER ground <br />❑ GroundworklSlab <br />❑ Fooling <br />❑ Rough In <br />❑ Foundation <br />❑ Ceiling Grid <br />❑ Structural Stab <br />❑ OK to insulate <br />teaming <br />❑ Rooftop Units <br />.21rnsulation <br />❑ Mechanical Final <br />❑ Drywall Nailing <br />❑ Shear Nailing <br />❑ Roof Nailing <br />❑ Ceiling Grid <br />[]Building Final <br />PLUMBING <br />❑ GroundworklSlab <br />❑ Rough In <br />❑ Ceiling Grid <br />❑ OK to insulate <br />❑ Water Service <br />Medical Gas <br />❑ Plumbing Final <br />GAS PIPE <br />❑ Rough INSemice Hot Water Tank <br />[ I Refrigeration ❑ Rough in <br />1 Gas Pipe Final i HWT Final <br />OTHER OR CONSULTATION. _ V iL� _ G .(/ram' <br />[) APPROVAL ❑ PARTIALPPROVAL FINAL APPROVAL THIS PERMIT <br />�] OK FOR T.C.O. FZ.9AN2tFqtCTION REOUESTED ❑ <br />❑ OK FOR C.O. ❑ VIOLATION <br />[1 U_ NA 6 LL -LE TO PERFORM INSPECTION: <br />Lr1.(4:5) 257-8681 FOR REI 24 hour notice required <br />ES <br />ZIT .SAX � Al0- <br />d kwnl - <br />Date: <br />nA1MAR. INC <br />