My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3018 W MARINE VIEW DR 2018-01-02 MF Import
>
Address Records
>
W MARINE VIEW DR
>
3018
>
3018 W MARINE VIEW DR 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2022 2:33:26 PM
Creation date
2/27/2017 6:39:19 AM
Metadata
Fields
Template:
Address Document
Street Name
W MARINE VIEW DR
Street Number
3018
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S:\MBricMdevelopment review\2007\02-Feb\Murphy Bldg Apartment WMVD.xIs <br />Prinled:2/23/2007 10:59 AM <br />Project Name Murphy Building Apartment Traffic Reviewer MGB <br />Project Location 3018 West Marine View Drive Dev Reviewer BS <br />Project Description 6 Unit Apartment Building Planner <br />Received Date 2/21/2007 Due Date 2/28/2007 Review Date 2/232007 File # <br />Area Type FCBD 0SW Everett MX Remainder <br />TRAFFIC STUDY REQUIRED <br />and Project Conditions and Phasing <br />afine Existing Land Uses <br />afine Project Land Uses <br />ovide Existing PM Peak Trip Generation <br />'ovide Project PM Peak Trip Generation <br />PM Peak Trip Generation on traffic count of existing or similar site <br />project phasing, including the size and scheduled completion dale of each phase <br />number of bedrooms per dwelling unit or dwelling units per structure <br />Mitigation Fee Estimate (NOTE - Fees may be recalculated at submittal If changes to project occur) <br />Proposed Development Traffic Fee Estimate (From Worksheet 1, attached) S3,1 32 <br />Existing Site Use Credit (From Worksheel 1, attached) $900 —) g DU rho�sl j <br />Estimate of Net Traffic Impact Fee (Including Existing Use Credit) = No Traffic Traffic Mitigation Fee Estimated 3 <br />Construction Issues <br />Provide construction phasing and timeline information <br />Provide evidence that parking will be adequately provided for throughout project. <br />Provide estimate of peak construction period traffic volumes <br />and get approval for traffic control plan prior to any interruptions to the local street network <br />Improvements <br />wide Fronlaoe Improvements H::ne <br />as needed from torvide Roadway Improvements asneeded from to <br />rvide Pedestrian/Bicycle Improvements needed from to <br />rvide Alley Improvements eded X from Pacific Avenue to N Property Line <br />wide ADA-approved wheel chair ramps at all crosswalks <br />wide Transit Shelter if project frontage includes transit stop <br />City of Everett Staff Use On:,, j <br />Ll / <br />
The URL can be used to link to this page
Your browser does not support the video tag.