Laserfiche WebLink
I Z - � <br />3� - a- 3/B" I <br />1 .���_ <br />t� _ 0_ ��8. <br />'� <br />A TE4PLATE ASSEMBLY P/N 102805 f5 <br />REOUIRED FOR INST�LLATION AND <br />AIUSi BE PLACED AS SHOMTt. CENTER <br />OF TEAIPLATE NUST BE PLACED OVER <br />A CENTER OF FWNDATION */- 3'. <br />TEYPLATE IS COLOR CODED GREEN. <br />TEMPLATE YUST BE LEVEL +/- 1 <br />DEGREE. INSTALL TEMPL�TE WITM <br />SUFFICIENT SPACE BENEATH (2' <br />��\ MININUN) TO PERYIT FINISMING OF <br />\}-C/L CONCRETE AND TO FACILITATE <br />�\ TEMPLATE REMOV�L PRIOR TO TONER <br />ERECTION. <br />/� SEE PAGE B FOR BASE SECTION <br />Q INSTALLATION OETA[L. <br />I C/L I <br />N— 3' -B' —�I <br />TOWER ANCNOR STEEL PLACEMENT — TOP VIEW <br />ANCIIOR BOLTS AIUST �E VERTICAL. <br />TEUPLATE uUST BE U7ILIZEO TO ASSIST IN PROPER PLACEMENT. <br />� TENPLATE - SEE ABOVE FOR PART NUuBER ANO ASSEMBLY DRAWING DATA. <br />LEMPLATE MUST BE SECUREO WITH 2 NUTS AS SHOWN. <br />10- 1/2' <br />----- - '--- _LQP_9� <br />FOUNOAT[ON <br />'--ANCHOR BOLT PM 10576� -2 REOUIRED PER LEC. <br />OIAUETER = t-1/2', LENCTH - 4'. COLOR CODE _ <br />GREEN. INSTALL WITH 10-1/2' OF TNREhDS EXPOSED. <br />3'- 1- 1/2' BENDINQ STRAIGNTENING OR REAL(CNtNC (HOT OR <br />COLD) OF THE ANCHOR BOLTS BY ANY AIETHOD IS <br />PROMIBITED. <br />VIEW A— A— ANCHOR BOLT INSTALLATION DETAIL (NOT TO SCALE) <br />ATTENT[ON CONTRACTOR INSTALLING THE ANCHOK tiu�i�! <br />1-1/2" DIAMETER ANCHOR BOLTS FOR FABRICATED TOWER. <br />VERIFY THE PART NUMBERS AND SIZES FOR ALL COMPOAENTS ON THIS PAGE AN� PAGE B. <br />IF THERE ARE ANY �ISCREPANCfES, PLEASE NOiIFY PIRUD, INC.,PR[OR TO INSTALLATION!! <br />VAluONi SiMMIV1E5 IS � OIYISION K VALVOxI INMKTPIES, INC. C1101�1FNIM <br />vro� (100)]20. UFT - 10/ZO/3001 u: n <br />Joseph P. Jaa <br />BNSF RAILWAY <br />WEST SEATTLE, WA <br />�r� :�: �a <br />��N, M, a � <br />�'.::::m .�..o�` SiRUC7UFe5 <br />R��IHO H0. <br />187215 <br />'q�2� <br />