Laserfiche WebLink
FRAME TIE INSTALLATION INSTRUCTIONS <br />Frame Tie With Hook <br />r <br />,.� ,4tlacn Uama nook b ap, <br />inboerd locetan of t-beam. <br />(Frame hook musl be attached <br />to Irame at pointa cbsest to . <br />��oor suppons.) <br />2.) Keepinp in Iine wilh the hook, <br />wrap yalvanized sUap can- <br />pletey around �-beam. <br />3) •Anchor muet be ascursyr <br />insteMed MNo tl�e yround bMor� <br />Proc�edlrq with eteP N3 <br />n,re�a aoe� e�a a � <br />through alolted tenebnkp bdt <br />ahachsd W bnsionirq head d' <br />anchor. Tip��ten eldled terF , <br />afoninp bolt r minimum of 6 <br />lirt�es 8 unW �11 slack �n sUap <br />is rertwwd. ' <br />Frame Tie With Buckle <br />i.) Thread 7' lenglh oi lrame tie <br />strap lhrough strap buckle as <br />shown. <br />2.) Next. thread bnp end of sUap <br />between hame and Iloor of <br />home. BruW suaP �hrou9h <br />buckle as shown in diaflram <br />and fasten to anchor head. <br />s) oiepram e►wws arav h po.i� � i <br />tion around herne end tlu0up11 <br />buckk. ft f6 hlpwWk b IMllwr <br />al, sleCk hom sy�lem. , <br />� <br />✓ <br />