Laserfiche WebLink
I <br />TO BE COMPLETED BY APPLICANT <br />EVALUATION FOR <br />AGENCY USE ONLY <br />c. Is the site pan of a migration route? If so, explain. <br />No <br />d. Proposed measures to Preserve or enhance wildlife, if any: <br />None <br />6. Energy and Nstvral Reaotrces <br />a. What kinds of energy (electric, natural gat, oil, wood stove, solar) will be used to meet <br />the completed project's energy needs? Describe whether it will be used for heating, manu- <br />facturing, etc. <br />Electricitv <br />Gas - heat <br />b. Would your project affect the potential use of solar energy by adjacent properties? If so, <br />generally describe. <br />No <br />c. What kinds of energy conservation futures are included in the plans of this proposal? <br />Liit other proposed measures to reduce or control energy impacts, if any: <br />Conform to Washington State Energy Code <br />7. Enviraaeu. He" <br />a. Are there any environmental health hazards, including exposure to toxic chemicals, risk <br />of fire and explosion, spill, or hazardous waste, that could occur as a result of this proposal? <br />If so, describe. <br />No <br />1) Describe special emergency Serviar that might be required. <br />None <br />?) Proposed measure to reduce or control environmental health hazards, if any: <br />None <br />b. Nofe <br />1) What types of noise exist in the area which may affect your project (for example: <br />traffic, equipment, operation, other)? <br />None <br />1) What types and levels of noise would be opted by or associated with the project on a <br />short-term or a long-term basis (for example: traffic, construction, operation. other)? Indi- <br />cate what hours noise would come .from the site. <br />During construction: Normal construction noise from <br />7 AM to 6 PM Mon, thru Fri. <br />6. <br />