Laserfiche WebLink
1 • <br /> �d� Liqhtinq of the parkinq lot should be a ainiaum of 1-2 foot <br /> candlas. <br /> e. The aparf.sant address and apartment nusb�ra should be 5 inch <br /> lettars and visible from the etreet and parkinq lota. <br /> f. Durinq tha final stnqes o! construction, please contect Dick <br /> Thornbarry, Cri'e Prevention Olficer at 259-0416 for further <br /> sacurity racommendations. <br /> 10. GTE Northwest has facilities at this lxation. ]�ny buildinq <br /> entrances ausY. be coordinatad at least 60 days in advance. Th9 <br /> coet of nny relxation of GTE facilitias that is required to <br /> construct the naw apartsent complex will be at the total cost of <br /> the davelopar. ]1ny ralocation vill taka 41r..ty to one hundred <br /> twenty days. Your contact at GTE Northwast ie Michael Hup! at <br /> 339-2052 for this buildinq entrance. <br /> 11. The 20 foot lira lana needs to be properly aarked and looped or <br /> elsa a turnaround aust be provided. <br /> V 12. ]� fire �xtinguiahar a ainimua siz• of 2A-1oBC aust ba provid <br /> vithin 75 fe�t tzav�l distance o! all apartsants et each lave . <br /> 13. The roadway elope ahown on the linal dravinqs vill need to be <br /> approvad by the Fire Dapartaent. <br /> i <br /> ' 5 <br />