My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6905 RAINIER DR SITE DEVELOPMENT 2016-01-01 MF Import
>
Address Records
>
RAINIER DR
>
6905
>
SITE DEVELOPMENT
>
6905 RAINIER DR SITE DEVELOPMENT 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2017 7:33:25 AM
Creation date
2/27/2017 7:33:15 AM
Metadata
Fields
Template:
Address Document
Street Name
RAINIER DR
Street Number
6905
Tenant Name
SITE DEVELOPMENT
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i ( <br /> 12. A onc year warranty is requircd on thc public improvement for vi amount not Icss than 10% of <br /> the cost of conseruction and shall ruu I'or one ycar from the date of �nal approval/issunnce of thc <br /> first Occupancy Pcr,:,it. <br /> l3. A h��o ycar �;uarantee is required for privatc retentionldetention or other drainaee <br /> trcatmcntlatb,ucmcnt tiicilitics ccrving arcas largcr than onc xcrc. <br /> Id. On-site walermain will l,e stakecl �vithin an easement lo the City. 'fhe easemcnt will be <br /> submitted lo thc City prior to issuancc of permits. <br /> I�. r1s-builts of storm sr.�ver, sanitary scwer, �md water s;�stems �vil! be required to bc submitted <br /> per Cily Design and Construclion Standards and Specilications tbr Dr.��elopment. <br /> IG. A Performance Gu,vantec is rcquircJ for street improvements on Rainicr Drive prior to any <br /> huilding permit hcing issucd. <br /> 17. '1'he construction plans must be designed from a site survcy perfonned by a licensed Statc of <br /> �Vashineton I�md survcyor. <br /> l8. Ali exposed ground must bc resccdecl within 30 days of the completiuu of construction. lf <br /> reseeding is nol praclic:il duc tu wcather or scasonal problems, the ground musL bc covcrecl with <br /> mulch as dircctcd by thc Cily I:nginccr. <br /> 19. 'I'empora�y erosion control measures fur construction activity must Ue operation�il prior �u <br /> con�mencement of:my �Iearing or carthwork. <br /> 20. City standards rcyuirc u�eauuent of storm �vater runol7' from hydraulicaily-connected pavement <br /> prior io dischargc ol thc storm «�a�cr fram ihc sitc, or to a su�cam, ���cUand, or undcrground <br /> infilU�alion syslem. <br /> Slorm �vatcr Ire�ilmenl is reqi-irecl �vhen 5,000 squaro Ieet or more of hyJraulically-connected <br /> pavemcnt is created autUor rcdevcloped by a projxt. '1'reatment of srorm walcr nmoCf frotn <br /> hych•aulic:dly-conncctc� pavcmcnt nmst occur, per City sumd,u•d:. prior to dischargc of thc <br /> storm n�atcr from thc sitc, or to a strc;un, wctland, or undcrgrowiti infiltration system. <br /> • If suilnble soils c�isl on lhe site, surface siorm waler infiltr.�tion sysletus (e.g., pervious <br /> p;iccrs ur surfacc ponding arcas and/or s�ti�aics) may bc uscu to uvoid cm.iting hydraulicall��- <br /> cunnecletl pavement Gom a ston» �vater tre;ument stand;u'd. <br /> • i:rom ;i sturm ���atcr u�caunent standpoint, tbr a p:i��ed arr.a to bc cnnsidered h}'draulicall)�- <br /> disconnrcted, stonn ��;ucr nini�ti ti��m al Ira;l tltc G-month. 2-l-ho�ir slorm must bc fully <br /> rrf;�incd ;m�l!ur in(iltratril. <br /> I'hc u�,tious li,r u�c:unu•nt ��f runnll':ii�iu h�'draulicull��-cunnccic�l p;iccnunt arc: <br /> j ai au intilu•atiun basin �vith pretn�umcnt"'. if suitable suils �xist un the sitc <br /> 1,1 ;i �vctpond <br /> c) a cons�ivctcd ���clland <br /> dl ;� st��rm n;ucr tcchnoloa)' th�t h;is recei��e:l a GUI.D (General Use Level Desienatiun) from <br /> th� A1�:i,hin_1��n tii:itr I)r��:n�im�•m �,f L'n,lnec li�r eiiher h:c,�c nr �nhanced tre;�nnrnt. ���ith <br /> i�rrir�:uni�nt ' <br /> i <br /> � � � � ;. <br /> ��,i <br />
The URL can be used to link to this page
Your browser does not support the video tag.