My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6907 RAINIER DR SITE DEVELOPMENT 2016-01-01 MF Import
>
Address Records
>
RAINIER DR
>
6907
>
SITE DEVELOPMENT
>
6907 RAINIER DR SITE DEVELOPMENT 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2017 7:36:58 AM
Creation date
2/27/2017 7:36:50 AM
Metadata
Fields
Template:
Address Document
Street Name
RAINIER DR
Street Number
6907
Tenant Name
SITE DEVELOPMENT
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I'L. r\ one year �varranly is required on ihe public improvement for an amount not less than 10% of <br />,, the cost of cor�truction and shall run 1'or one ycar from the date of Gnal approval/issuance of thc <br /> lirst Occupanr.y Pcrniit. <br /> l3. A hvo ycar guarantce is requircd for privatc retention/detention or othcr drainage <br /> lre�itmendabatement facilitics scrving arcas I��rger than one s�cra <br /> Id. On-site walrnnain will bc stakcd within an �asemei,t to tlie City. 'Chc easement will be <br /> submitted tu the City prior to issuance of permi�s. <br /> I5. As-buihs ef storm sc�ver, sanil�iry sc�vcr, and �vnter systems wilt be requircd to bc suUmitred <br /> per Ciry Der`,n and Construclion Slandar<ls and Specifications (or Development. <br /> IG. A Perform:mce Guaramce is required for strcet improvements on Rainier Drive prior to any <br /> huilding permit bcing issucd. <br /> l7. '1'he construction pl.�ns must be designe:l from a site survey perPormed by a licensed State of <br /> 1Vashington I�md survcyor. <br /> l3. All esposed grouncl must bc reseedecl �vithin 30 days of the completiun of construction. If <br /> reseeding is not practic,il due to weather or seasonal probiems, the ground must be coverecl with <br /> mu:ch as dircctc�l Uy thc Cily Gnginccr. <br /> 19. '1'empor,iry crosion control me�isurcs for consuuction activity must Uc operational prior to <br /> conunencement of any cicaring or earthwork. <br /> 20. City stanJards requirc U•catment of stonn tvatcr runoff from hydraulically-connectcd pavcment <br /> prior to disch�irge of tl�e storm �vater I'rom ihe site, or lo a stream, wetland, or undcrground <br /> rafiltration systcm. <br /> Storm water treatmenl is required �vhen �,000 square feet or more o1' I�ycir.mlically-connected <br /> pavement is crealed �md/or redcvcloped by a project. 1'reaunent of storm water run��Cf from <br /> hydr;�ulically-connccled p:rvcmcnt nmsl occur, per City s�attdards, prior to dischargc of thc <br /> s�urnt watcr from tltc silc, or to a s�rcam, �v�Uand, �r undcrgrowid inGitration systcm. <br /> • If suitabic soils csisi on �hc si�e, surCicc storm �vater in(ilU'ation sv�tcros (e.g., pereious <br /> pa�crs or surface ponding are;is and/or s���aies) m�q� be used tu avoid crcating hydraulically- <br /> cunnected pa��emcnl Crom a storm tv;der ire;�tment standard. <br /> • I�rom a storm �vater trruutent sta��dpoinl, li>r a pa��ed :vat to he considered hydraulically- <br /> Jisconnected, storn. �v;ucr runofC from ;it Ie:ist the (i-ntonth, 2-l-hoin� storm nmst be �idly <br /> relai�ud and/or inliltrated. <br /> Che options lor treatntent oF nmoff frum h�'draulically-connectcd p:i��entent are: <br /> a) :m inlilU�ation Uusin ���iih prctrcatmcnt", if suilablc suils o�ist nn thc sitc <br /> b) a wc�pond <br /> c) a constructed n�etla��d <br /> d) ,� storm �vater technology that has received a GUI.D (Gener.11 USC Ll'ViI DCSI�IIIUOI7� CC0111 <br /> �he \Vasl�ington Statc I)ep;iruucnt n( ficuloe}� tor eith�r basic or enhanced lreaUnent, with <br /> prclrcattncnt'� <br /> •l <br />
The URL can be used to link to this page
Your browser does not support the video tag.