My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7211 RAINIER DR BASE FILE 2018-01-01 MF Import
>
Address Records
>
RAINIER DR
>
7211
>
BASE FILE
>
7211 RAINIER DR BASE FILE 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2019 3:44:43 PM
Creation date
2/27/2017 8:02:09 AM
Metadata
Fields
Template:
Address Document
Street Name
RAINIER DR
Street Number
7211
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
505
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
/ <br /> �1 <br /> PUBL/C WOR/ffS <br /> , <br /> � <br /> � <br /> MEMORANDUM <br /> TO: Kirk Brooks <br /> FROM: Jane Zimmern�an <br /> DATE: July 12, 1995 <br /> SUgJECT; Drainage Calculation Review, Bridge Creek Townhomes, <br /> SEPA N18-95 <br /> A planimetered (or otherwise generated) elevation to surface area relationship for the <br /> pond/vault must be submitted to the City, to allow the City to generate the pondlvault's <br /> stage-storage volume relationship for routing calculations. <br /> From the stage-storage relationship of the pond/vault, the stage at which the City's <br /> required detention volume will be reached must be noted. The pond's overflow <br /> elevation must be set at this elevation. <br /> The 6 month, 24-hour developed srorm must be routed through the pond\vault with a 1 <br /> inch orifice as the primary outlet. The amount of]ive storage thai "backs up" must be <br /> determined, and subtracted from the wetpond design volume (the wetpond design <br /> volume is '_'001 cubic feet, as determined from the 6 month, 24-hour developed storm <br /> hydrograph volume) to determine the required dead storage volume. This required <br /> dead storage volume must be provided below the outlet elevation of the pond. A <br /> minimum of 15% of the wetpond design volume (or 300 cubic feet) must be provided <br /> in the wetpond treatment cell, at a maximum average water depth of 1.33 feet. The <br /> rest of the dead storage volume may be provided in the vault upstream of the pond. <br /> The 6 month, 24-hour developed storm hydrograph must be routed through the <br /> pond\vault and the peak stage in the pond must be noted. A secondary orifice must be <br /> located at this elevation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.