My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2202 BROADWAY DUTCH BROS COFFEE 2017-04-05
>
Address Records
>
BROADWAY
>
2202
>
DUTCH BROS COFFEE
>
2202 BROADWAY DUTCH BROS COFFEE 2017-04-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2017 2:45:26 PM
Creation date
2/27/2017 8:28:23 AM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
2202
Tenant Name
DUTCH BROS COFFEE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A . , PUBLIC KS PERMIT Date: 1/20/2016 <br /> 14/— ORPublic Works Permit#: PW1601 045 <br /> City of Everett Public Works Department <br /> ::= �y� �` 3200 Cedar Street Parent Permit#: B1601-030 <br /> Everett, WA 98201 Planning Reference#: REVI15-021 <br /> (425) 257-8810 <br /> Public Works Fee$: $ 13,054.46 <br /> Other $: <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> SJC PROPERTY LLC STRELKA JOSEPH/C2K ARCHITECTS <br /> 1617 5TH AVE N <br /> SEATTLE WA 98109 <br /> PHONE: PHONE: 5034442208 <br /> TAX PARCEL ID# 00439147503100 SITE ADDRESS: 2202 BROADWAY <br /> SITE DEVELOPMENT DRIVE THRU COFFE SHOP - DUTCH BROS COFFEE <br /> EVERETT PLAT OF BLK 475 D-00 - <br /> LOTS 31 & 32 <br /> PERMIT CONDITIONS <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br /> and Specifications. <br /> 3. Call Location Underground Service 48 hrs before you dig. TOLL FREE NUMBER 811 r; <br /> 4. Site Civil Work to be done per plans approved by the City of Everett Public Works i–, i---' 1---, r I <br /> Department dated 04/28/2016. :jj F=1 ,74.,,,!---'7—t —mw <br /> 5. Contact the City of Everett Public Works Inspector Randy Allen at 425-339-7403 pry -- , ,��?; o=' <br /> to starting construction and with other inspection requests. cn., ::_n`.; �; <br /> 6. Install erosion control measures per City of Everett Standards for small parcels and ) ) `_-, I* <br /> remove upon completion of the project prior to final approval of the permit. '^ 4)I. <br /> 7. Keep City streets clean at all times. No dirt, mud, rocks, or debris to be tracked onto L4 � -� <br /> roadway. ' <br /> 8. Protect all existing underground utilities during construction. <br /> 9. All work constructed within the public right-of-way must be removed or relocated av 4,N.:) t-,.,F itt ' <br /> the owner's expense if the City ever requires use of the right-of-way for municipal ; )r :ter:';_ r;) - � <br /> _g::. ,,,w . ,,vrl, , <br /> purposes. <br /> ..0 .i:^1�"5 rxi syr.. c) ::Y <br /> i:7 _r i:.,)� 7 .._`_J c� >>' <br /> L 1'n! C <br /> ---i Nfl <br /> Public Works Permit Fee Breakdown: r_:; <br /> Erision Control Plans-CommerciaVlndust.) $200.00 <br /> ,_.t <br /> Cin <br /> Grade/Fill/Excavate $120.00 <br /> Parking Lot Paving(sft) $45.00 <br /> PW Plan Review $149.82 PO <br /> PW Site Inspection $299.64 <br /> Traffic .tigation $12,240.00 <br /> / <br /> ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and save harmless the <br /> 0 / City of Everett from any and all claims for damages,costs,expenses,or <br /> _��—�� .1�`4de -;--- 1°/ _ causes of action that may arise because of installation and maintenance of the <br /> improvement or other right-of-way use hereto applied for and further agrees to <br /> pproved for Constr rn D:te remove same upon notice from the City and to replace public property <br /> damaged thereby. <br /> FINAL INSPECTION Date Cr---- j)A .. s/30 i, <br /> Approved as Constructed Signature of Applicant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY <br /> PURSUED TO COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br /> A <br /> Ty:ee___ <br />
The URL can be used to link to this page
Your browser does not support the video tag.