My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7622 RAINIER DR 2016-01-01 MF Import
>
Address Records
>
RAINIER DR
>
7622
>
7622 RAINIER DR 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2017 8:40:52 AM
Creation date
2/27/2017 8:40:44 AM
Metadata
Fields
Template:
Address Document
Street Name
RAINIER DR
Street Number
7622
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i � . <br /> CASCADE GEOTECFINICAL <br /> June 10, 1991 <br /> Lyle Blani: <br /> Job No. 9105-16G <br /> Page 6 <br /> flow into a suitahle outlet. <br /> E:oeion Control <br /> IAll erosion control measures should meet the City of Everatt <br /> I specifications. Silt fences should be used along the north and <br /> south property lines and along the twenty-iive (25) foot setback <br /> I lines lo�-ated to the east of the creek/drainage ditch. The silt <br /> fences should be maintain�d throughout censtruction. Silt control <br /> measures should be implemented for the drainage ditches. <br /> I <br /> If any soils are stockpi.led on the site, ve recommend covering 1.t <br /> Iwith plastic sheeting that is securel�� anchored with sandbags and <br /> stakes at the end of each wozk day and at the onset of inclement <br /> iweather. <br /> IFoundation Desian Parematers <br /> Firm, horizontal surfaces of the native, undisturhed medium dr.nse <br /> Ito very dense silty sand with some gravel (till) and the medium <br /> dense to dense sand with some silt and gravel have a maxlmum safi� <br /> Ibearing capacity suitable for supporting spread footings designe3 <br /> to 2000 psf if the soils are undisturbed, free of org�nic material, <br /> I and do not become saturated prior to concrete placement. <br /> Structural fill which is placed on firm, unweathered nativu bearing <br /> I soils are also suitable for the support of a spread iooting <br /> foundation designed as above. The structural fill should meet the <br /> recommendr.tions stated in the Structural Fill section of this <br /> Ireport. The topsoil noted in the test pits is unsuitable for <br /> support of the proposed foundation and slab-on-grade floor siace <br /> iunacceptable differential settlement and distress to the slab would <br /> � be expected. <br />
The URL can be used to link to this page
Your browser does not support the video tag.