My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2408 RAVENNA ST 2016-01-01 MF Import
>
Address Records
>
RAVENNA ST
>
2408
>
2408 RAVENNA ST 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2017 4:29:18 PM
Creation date
2/27/2017 8:57:52 AM
Metadata
Fields
Template:
Address Document
Street Name
RAVENNA ST
Street Number
2408
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� - � �.. <br /> Ltr. Tredwav (CO209-010) <br /> September 24, 2002 <br /> Page 2 <br /> 9. The bottom of the glue laminated beam in the basement is less than 7'0" above the <br /> finished floor. <br /> 10. The GLB appears to be inadequate for the minimum loads specified in the UBC. <br /> I1. The floor joists specified are not the correct nomenclature provide the current joist <br /> description. <br /> 12. Specify beam size species and grade of beams at stairs. <br /> 13 Insulation baffle shall extend 6" vertically above batts and 12" vertically above loose <br /> fill insulations. Show requirement on plans. <br /> 14. All above grade walls and below grade walls wi[h insulation on the interior aze <br /> required to be insulated to R-21. <br /> 15. See enclosed typical residential foundations wall detail. Incorporate all requirements <br /> into drawing set. <br /> 16. Typical stair section does not show guardrail requirement. Handrails are not require� <br /> to extend 6" past the stairs. Retum handrails to wall. <br /> 17. Provide footing under stair stringers. <br /> 1S. Verify foatings under both ends of the GLB in the basement. <br /> 19. Show step-downs on foundation plan. <br /> 20. The deck detail on sheet 3 calls out a CC68 on top of the posts but the framing plan <br /> for the deck (Sht. 3) shows a 4 x 10 beam. <br /> 21. The slab on grade detail on sheet 10 does not show R-10 rigid insulation with u <br /> thermal break. <br /> 22. The monolithic slab detail does not show exterior rigid insulation. The insulation is <br /> required to be protected from exposure to ultra-violet light and from impact. <br /> 23. Specify safety glass in hazazdous locations per 2406 UBC. <br /> 24. Show all required hold downs on the foundation plan. <br /> 25. Show height calculations on elevation view. Specify reference point and max <br /> elevation. <br /> 26. Special inspection required per Nelson Geotechnical Associates, Inc. dated <br /> September 16, 2002. "Final subgrade to be evaluated by a geotechnical engineer .." <br /> prior to pouring concmte. Include this requirement on foundation plan. <br /> rnanvri scna�six.,i{nu�:�.�cro:m.omc+oe Kaveunnsn � <br />
The URL can be used to link to this page
Your browser does not support the video tag.