Laserfiche WebLink
• <br /> EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET 3 <br /> PROJECT TITLE: <br /> Call for Bids for the X Consent COUNCIL BILL# <br /> Construction of the Sewer Action Originating Department PW/Utilities <br /> System Replacement "H" First Reading Contact Person Jenifer Galatas <br /> Project. Second Reading Phone Number 425-257-7215 <br /> Third Reading FOR AGENDA OF June 7, 2006 <br /> Public Hearing <br /> Initialed by: <br /> Department Heat ,'�i. <br /> CAA <br /> Council President <br /> Location Preceding Action Attachments Department(s) Approval <br /> See Attached Project Authorization of Project Location Map <br /> Location Map Amendment to the <br /> Professional Services <br /> Agreement for design, <br /> January 2006 <br /> Amount Budgeted $ 1,320,000 <br /> Expenditure Required $ 2,000 Account Number(s):UP 3206 <br /> Budget Remaining $ 1,318,000 <br /> Additional Required 0 <br /> DETAILED SUMMARY STATEMENT: <br /> Sewer System Replacement "H"replaces approximately 4,200 linear feet of deteriorated and undersized <br /> combined sewer mains in North Everett. The existing mains are up to 104 years old; have deteriorated; and <br /> now have sags, flat slopes, directional misalignment, broken joints, root intrusion and cracked pipe. The <br /> condition of these mains have contributed to decreased capacity and increased repairs. <br /> This project will provide increased capacity and decrease sewer failures, providing increased reliability of the <br /> system. <br /> The Professional Services Agreement for the design of this project was approved in January 2006. <br /> The total amount budgeted for the design and construction of this project is $1,650,000. Previously approved <br /> expenditures include $248,000 for design. <br /> RECOMMENDATION (Exact action requested of Council): <br /> Authorize a Call for Bids for the construction of the Sewer System Replacement "H" Project. <br /> 4 <br />