My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2805 BROADWAY SISKUN POWER & EQUIPMENT 2017-02-27
>
Address Records
>
BROADWAY
>
2805
>
SISKUN POWER & EQUIPMENT
>
2805 BROADWAY SISKUN POWER & EQUIPMENT 2017-02-27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2017 9:03:11 AM
Creation date
2/27/2017 9:03:08 AM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
2805
Tenant Name
SISKUN POWER & EQUIPMENT
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' GENERAL NOTES: <br /> Pacific <br /> 1, ALL WORKMANSHIP SHALL BE OF THE H IGHEST QUALITY AND Engineering <br /> ' SHALL BE IN ACCORDANCE WITH ALL MANUFACTURERS' 1oB No. 1612100 SHEET 2 of 3 <br /> SPEC IFICATIONS, DIRECTIONS AND RECOMMENDATIONS. THE WORK Technologies JOB NAME: SISKUN POWER EQUIPTMENT <br /> SHALL ALSO BE IN STRICT CONFORMANCE WITH INDUSTRY ® NOTES <br /> STANDARDS AND COMPLY WITH SOUND ENGINEERING AND DATE 25 APRIL, 2016 <br /> CONSTRUCTION PRACTICES. THE CONTRACTOR SHALL REPLACE CHK BY <br /> 1700 Westlake Avenue North - Suite 100 Seattle, Washington 98109 CoMP. BY: M. SMITH <br /> PORTIONS OF THE INSTALLED WORK THAT DOES NOT MEET THESE Telephone. [206] 281-7500 Facsimile: [206] 281-4611 <br /> REQUIREMENTS AT THEIR EXPENSE. Nationwide: [800] 621-7300 <br /> 2. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH <br /> APPL I CABLE , STATE AND LOCAL L AWS, ANDACCORDANCE WIITHRCURRENT CODE REQUIREMENTS. IN /� NOTGENER ; <br /> 12. ALL SUCH PRODUCTS AND MATERIALS SHALL BE INSTALLED IN <br /> 3. THE CONTRACTOR SHALL COORDINATE ALL REQUIRED LOCAL ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS <br /> JURISDICTION INSPECTIONS AND SPECIAL INSPECTIONS. AND INSTALLATION INSTRUCTIONS, INDUSTRY STANDARDS AND <br /> 4, THE CONTRACTOR SHALL FILE FOR AND SHALL OBTAIN THE CODE REQUIREMENTS. THE CONTRACTOR SHALL SUBMIT TO <br /> PAC IF IC ENGINEERING TECHNOLOGIES, INC., A COPY OF THE <br /> PERMITS FOR ANY ADDITIONAL WORK IF REQUIRED BY ANY INSTALLATION INSTRUCT IONS AND RELATED INSTALLATION <br /> GOVERNMENTAL AGENCIES. STANDARDS AND REQUIREMENTS FOR REVIEW AND APPROVAL <br /> AND THE CONTRACTOR SHALL KEEP A SET OF THESE <br /> 5. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR THE INSTRUCTIONS ON THE SITE DURING REPAIRS RELATING TO THAT <br /> CONDITIONS AT THE JOB SITE, INCLUDING THE SAFETY OF ALL WORK. <br /> PERSONS AT THE JOB SITE DURING THE PERFORMANCE OF THE <br /> WORK. THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT 13. NEW THERMAL INSULATION MUST COMPLY WITH THE CURRENT <br /> BE LIMITED TO NORMAL WORKING HOURS. EDITION OF THE SEATTLE ENERGY CODE. <br /> 6. THE CONTRACTOR SHALL PROVIDE ACCEPTABLE SAFETY AND <br /> SECURITY MEASURES AND SHALL MAINTAIN SAFETY AND <br /> SECURITY AT THE JOB SITE DURING THE ENTIRE COURSE OF THE <br /> PROJECT. <br /> I3UILIDING ENVELOPE NOTES: <br /> 1. THE CONTRACTOR SHALL PROVIDE TEMPORARY BARRICADES ENERGY CODE: <br /> AND OTHER FORMS OF PROTECTION TO PROTECT THE PUBLIC PROVIDE THERMAL INSULATION TO THE MAXIMUM EXTENT POSSIBLE <br /> FROM INJURY DUE TO DEMOLITION AND REPAIR WORK. IN ACCORDANCE WITH 2012 WASHINGTON STATE ENERGY CODE AS <br /> BARRICADES ARE TO REMAIN IN PLACE AFTER DEMOLITION FOLLOWS: <br /> WORK HAS BEEN COMPLETED AND THROUGHOUT THE DURATION <br /> OF THE WORK. <br /> VAULTED CEILING / ATTIC R-49 <br /> S. THE CONTRACTOR SHALL PROVIDE SCAFFOLDING, WORK AREAS, VAPOR RETARDERS: <br /> BUILDING MATERIALS AND TOOLS SHALL BE REASONABLY PROVIDE A VAPOR RETARDER WITH A MINIMUM ONE PERM DRY <br /> SECURED FROM ACCESS TO THE PUBLIC AT 4.._1_ TIMES. $ 4*. <br /> CUP RATING ON INTERIOR (WARM) SIDE OF CEILINGS THAT ys,,. Nv,L P. St. <br /> 9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DEMOLITION, SEPARATE A HEATED FROM AN UNHEATED SPACE. VAPOR �� of AAs ' 1?r.� <br /> TEMPORARY BRACING, METHODS, TECHNIQUES, SEQUENCES AND RETARDER SHALL BE 6 MIL POLYETHYLENE SHEETING. #ti�,cv �l4c f,� <br /> PROCEDURES IN CONNECTION WITH THE WORK. �� �� ° r10 <br /> ATTACH POLYETHYLENE SHEETING TO THE UNDERSIDE OF CEILING K " :� <br /> 10. THE CONTRACTOR SHALL PROVIDE TEMPORARY BRACING OR JOISTS AND INTERIOR FACE OF WALL STUDS BY APPLYING 4 <br /> CONTINUOUS BEAD OF SEALANT TO EACH JOIST OR STUD. $$ 1"- -- <br /> SUPPORT TO PRE VENT MOVEMENT OR SETTLEMENT OF STRUCTURE .� '5',,,, � e� "' <br /> 1,A, G 3779' w ,,,, <br /> AS NEEDED IN AREAS BEING REPAIRED. o•9k-' crtmA� Et1Gc'' 'w <br /> INSTALL POLYETHYLENE IN CONTINUOUS SHEETS AS MUCH AS �S ,AGti A <br /> II. PROVIDE SCAFFOLDING AND TEMPORARY WEATHER PROTECTION POSSIBLE, ACROSS CEILING AND WALL. WHERE LAPS DO OCCUR, 4; 10NAL E . <br /> THE LAPS SHALL BE 6" MINIMUM AND SEALED WITH TAPE OR �` `/ eS <br /> FOR AREAS OF THE BUILDING EXPOSED DURING CONSTRUCTION SEALANT. CONTINUOUSLY SEAL BOTTOM AND TOP EDGES TO WALL /�' <br /> AS NECESSARY TO ACCOMPLISH THE REPAIR WORK SUFFICIENTLY AND CEILING TERMINATIONS. SEAL VAPOR RETARDER TO ANY <br /> WORKAND TO PREVENT WATER DAMAGE FROM OCCURRING AS THE CONDUIT, BOXES, PIPING OR OTHER ITEMS WITHIN THE CEILING AND <br /> PROGRESSES. WALL SYSTEM, REPAIR ANY TEARS OR PENETRATIONS OF VAPOR <br /> RETARDER WITH APPROVED TAPE PRIOR TO INSTALLATION OF ALL INFORMATION ON THIS DOCUMENT <br /> DRYWALL. IS THE EXCLUSIVE PROPERTY OF <br /> PACIFIC ENG=INEERING TECHNOLOGIES, INC. <br /> (c COPYRIGHT 2016 <br /> 16127 wd.s2.dwg <br />
The URL can be used to link to this page
Your browser does not support the video tag.