Laserfiche WebLink
-\ . <br /> COMPLIANCE " $ • � � � � , <br /> • REOUIRED � _ . <br /> .. <br /> INSPECTION IMPORTANT: p�QI place checks in the two left columns. <br /> � APPROVED� . <br /> a � : ; . : a��������'�,. r <br /> O O �Exposed foam insulatlon shall comply as foilows (S. 502.1.4.7): <br /> p Protected with metal or plastic flashing, or other suitable material that extends below grade. <br /> p Insulation is approved tor sub-grade, exterior use and properiy instalied. <br /> O 0 �Alrflow between tresh air ports and the whole-house fan ensured by undercut doors/grills(VIAQ,S.302.6.4) <br /> O 0 �Looseflil Insulation OK R (5.502.1.4.5): <br /> ❑ maximum ceiling slope not> 3 in 12 <br /> ❑a30"ot clear distance from top of bottom chord to underside oi rooi sheathing at the root ridge. <br /> O O �6 mIi black polyethylene ground cover, shall be lapped 12" at joints and extend to toundation wall <br /> p p e Clearances shall meet listed minimums belween insulation and (S.502.1.4.3): <br /> p chimney o Non-IC rated recessed lights: l/2" to combustables, 3"to insulation. <br /> O O � Attic hatch shall be insulated to required ceiling R-value and is weatherstrippen (S.502.1.4.4) <br /> O O Attic access shall have wood dam or equivalent to retain loose fill insulation in attic(S. 502.1.4.4) <br /> p p Ail exterior doors (except 20 mfnute doors) shall be weatherstripped (S.502.4.3). <br /> p p a Service hot & cold water plping in unconditioned spaces shall be insulated to R-3(S.503.11) <br /> p p + Serv(ce recirculatlon hot water piping in unconditioned spaces shall be insulated to Table 5-12 levels. <br /> p p Qz Heat pump thermostat shall have progamable capability(S. 503.8.3.5) <br /> p p �z�Thermostat provided for each HVAC system with range of 55-75' F.(heating) (S.503.8.1.1). <br /> p p s�a Readily accesstble,automattc or Manual means provided to restrict or shut-oii Heatin� input to each <br /> zone or floor during periods not requiring heat (S. 503.8.3.1). <br /> • �•p O s ontrols tor backup heat prohibft similtaneous operation of the primary system (S. 503.22(3)). , <br /> O O s echanical ventilation system shall have proper timers, and/or switches(VIAQ, S. 302.3). <br /> p p � echanlcal ventilatlon ducts shall have R-4 insulation in �mconditionad spaces (VIAQ, S.302.5) <br /> p O s echanical ventllation supply ducts in r.onditioned spaces shall have R-4 insulation (VIAQ,302.5) <br /> p p s upply ducts shall have volume dampers, or the equivalent,to balance system (S. 503.6). <br /> p p �upply and return aly ducts shall have sealed duct joints in unconditi�ed spaces (S. 503.102). <br /> p p r VAC plenums,supply, and return air ducts shall have H-8 insulation (Table 5-11,All options) <br /> O O z lectrfc water heater(s) shall have (S.504.2.1, 504.3, 504.4) : <br /> ❑separate power shut-off � 1987 NAECA Lable on tank <br /> p noncompressible R10 pad (unheated spaces only) o Temperature setting s 120 F. <br /> � O a�howers and lavatorles shall limit ilow to s 3.0 galions/minute (S.504.8.1). <br /> O O a�W�mming poois(S.504.5) shall have: <br /> p readily accessible ON/OFF swftch (pump, heater) pPool cover ❑Piping insulaied to S.503.11 <br /> O � �II itrepiaces (VIAQ, S.40'2.3) shali have: <br /> � 6 square inch combustion air supplyduct w/ accessible damper directiy connected to the fire box <br /> p Tight fitting glass or metai doors. o Tight fitting fiue damper <br /> p p e Solld fuel burning appilance(s) (VIAQ, S.402.2) shail have: <br /> ❑Tight tiriing giass or melal doors <br /> o0utside combustion air source directly connected to the tire box <br /> pException: PJon-direct,4" diameter, dampered, combustion air source: aliowed only for(t) new stove <br /> installations i�i existing homes where obstructionsprecludes direct combuslion air,or(2) Central <br /> heating systems located in unheated spaces. <br /> O O � Three month, etched track radon monitor, printed instructions, and information sheets shall 6e supplied <br /> to the si;igle family dwelling or first iloor units of multi-family dweilings by the general contractor(VIAQ,S. <br /> 502.2.i), <br /> WSEC Final phase requirements: <br /> Inspected by: Date_ <br /> Page 6 ot 6 <br />