Laserfiche WebLink
. ��i � <br /> ,� �� <br /> II <br /> r." <br /> Februazy 18, 2000 <br /> Jetry Coon <br /> 10203 Dakota Way <br /> Everett, WA 98204 <br /> Subject: Owner: Joel Coon <br /> Job Address: 4508 Ridgemont Dr. <br /> Plan Check No.: B0001-016 <br /> Dear Mr. Coon: <br /> In response to your application for a construction permit, your pians have been examined and you are <br /> advised that the iss�iance of a permit is being withheld for the reasons listed below. These comments <br /> address building issues only, additional revisions or additions may be required by other departrnents <br /> (such as Utilities, Planning or Fire). All references refer to the 1997 Unifonn Building Code, as <br /> amended by the State of Washington and/or Washington State Energy Code 1997 Edition, unless <br /> stated othetwise. <br /> In order for the processing of your application to continue, it will be necessary to <br /> �rovide the Building Division with two complete new sets of drawings reflec�ing <br /> he ^orrecHons reqwred. <br /> 1. Provide cross section of property from front (south) to back (north) property lines. The section <br /> should be tluough the center of the g�rage. <br /> 2. Provide revised site plan that shows actual location of proposed garage. <br /> 3. Show how building meets the requirements of Section 1806.5.2 "Buiiding Clearance from <br /> Ascending Slopes", or provide an investigation and recommendation of a qualified engineer to <br /> demonstrate that the intent of Section 1806.5 has been sadsfied�such an investigation shell include <br /> consideration of material, height of slope, slope gradient, load intensity and erosion characteristics <br /> of slope material. <br /> 4. Retaining walls with more than 3'-6" of unbalanced backfill are required to be designed by a <br /> licensed Washington State Structural Engineer. <br /> Prepare a response letter showing where each item in this correction letter is addressed on the plan set. <br /> Upon resubmittal of the drawings, your application will be given priority and plan review will <br /> recommence. <br /> All required submittals shalf be of sut�icient detail and contain sufficient information to ensure ihat the <br /> proposed structure will be constructed in compliance with all adopted codes. <br /> Sincerel <br /> � <br /> Jeff <br /> Dev lopment Technician <br /> 1CL�PLANCHFCKMROOOIAI6 <br /> CITY OF E�'ERETT• 3200 Cedar Straet• Everett,WA 987.01 • (425;257-8800• Fax(425)257-8856 <br />