My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7521 BROADWAY 2017-02-27
>
Address Records
>
BROADWAY
>
7521
>
7521 BROADWAY 2017-02-27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2017 9:25:22 AM
Creation date
2/27/2017 9:25:15 AM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
7521
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ETT <br /> (425) 257-8810 <br /> Plan Check No.: C1601-015 <br /> Application Date: 1/28/2016 <br /> -� Tenant: [TenName] <br /> cx1 <br /> C.) C�."•J•C.--i-i C;.moi. ;: Owner: ADAIR ENTERPRISES LLC <br /> -i 0'..;+1.-a`,�.-F;=i,--i L 'c i <br /> '; �2 ®°9' Job Address: 7521 BROADWAY <br /> l -*AP _•:, <br /> II ip <br /> v•-.1Proposed Use: NEW SFR <br /> M 1 <br /> If. <br /> C'd <br /> «•,-14 {Description of Work: NEW SFR RB1601-001 -ADAIR PLAN1999 <br /> I C=J <br /> Plan Check Fee Paid: $461.24 <br /> --i;I=�G 2i=yt--rx ice+17:2 <br /> The building permit application for the above-referenced project is being conditionally accepted for filing <br /> dingthe determination of its completeness. <br /> If the City review determines that any additional land use approval or any additional information is <br /> required to complete your building permit application, it will be necessary to submit this additional <br /> information or acquire the additional land use approval prior to your application being considered complete <br /> for filing. If no other land use approval or additional information is required,your building permit <br /> application will be considered filed as of this date. Plan review fees are estimates. Final plan review fees <br /> will be calculated at permit issuance. <br /> BUILDING PERMIT APPLICATIONS EXPIRE IF NO PERMIT IS ISSUED <br /> WITHIN 180 DAYS FOLLOWING THE DATE OF APPLICATION. <br /> //X q- <br /> All <br /> Signature Date <br /> FILE COPY <br />
The URL can be used to link to this page
Your browser does not support the video tag.