Laserfiche WebLink
3 <br /> 4. Power to operate dewatering equipment on the biosolids handling pad is not <br /> available. A generator will be necessary to provide power for operations. <br /> The cost associated with this item is $90,279.99 and provides for the rental, <br /> delivery, installation, fuel, maintenance and removal of a 350 kW generator. <br /> B. The following change is applicable to both the Biosolids and Backwash Solids <br /> Removal portions of Phase 3 of the Contract. <br /> 1. To expedite biosolids and backwash solids removal operations,the parties agree that <br /> a 24-hour, 3-shift workday is necessary. To accommodate this work schedule, <br /> lighting is required for biosolids dewatering operations at the biosolids handling pad <br /> and backwash solids disposal at the landfill at the Water Filtration Plant. Power and <br /> lighting is not available at either location. <br /> The cost associated with this item is$19,794.33 and provides for rental,delivery, <br /> set up, fuel, maintenance and removal of 2 light towers. <br /> 19 <br /> Exhibit A <br /> Page 4 of 4 <br />