My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006/07/12 Council Agenda Packet
>
Council Agenda Packets
>
2006
>
2006/07/12 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2017 10:26:45 AM
Creation date
2/27/2017 10:25:24 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
7/12/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET 8 <br /> PROJECT TITLE: <br /> Award Contract for the Garfield Consent COUNCIL BILL# <br /> Park Playground and Perimeter X Action Originating Department Parks <br /> Improvements. First Reading Contact Person Kaftanski/ <br /> Hauser <br /> Second Reading Phone Number 8344 <br /> Third Reading FOR AGENDA OF July 12,2006 <br /> Public Hearing <br /> Initialed by: P/4 <br /> Department Head <br /> CAA <br /> Council President <br /> Location Preceding Action Attachments Department(s) Approval <br /> Garfield Park Construction Fund Parks, Admin, Legal <br /> 2300 Walnut Street Ordinance, <br /> Call for Bids 5/3/2006, <br /> Budget Committee <br /> Approval 6/28/2006 <br /> Expenditure Required $ 399,648 354 5000000029 650 <br /> Amount Budgeted $ 585,148 <br /> Additional Required $ 0 <br /> DETAILED SUMMARY STATEMENT: <br /> This project will result in the renovation of the playground and perimeter of Garfield Park. The scope of <br /> work includes removing perimeter fence, playground, south parking area, paths and sidewalks; installing 34 <br /> new parking stalls; installing new 4' fence with new concrete mow strip around the perimeter; constructing 4 <br /> new columned entryways and plazas; constructing curbing for new playground area; and installing new <br /> sidewalks and benches around playground area. The Parks Department received 4 bids ranging from <br /> $399,648 to $535,398 including sales tax. The low bidder is Tastad Construction, Inc., of Snohomish, WA. <br /> This contract does not include playground equipment, which will be procured under a separate contract not to <br /> exceed $150,000. <br /> RECOMMENDATION (Exact action requested of Council): <br /> Award Contract to Tastad Construction, Inc., in the amount of$399,648 including Washington State sales <br /> tax for the Garfield Park Playground and Perimeter Improvements Project. <br /> 33 <br /> C:\Documents and Settings\hgausman\Local Settings\Temporary Internet Files\OLK3\Council Agenda-Award Garfield Park 2006.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.