Laserfiche WebLink
INSPECTION REPORT <br /> v Date: 61- ILA-1(0 Permit: <3\QOcj --QZ7_,_. <br /> hh � <br /> v , Contractor:, S SC.``vim\, If\( <br /> 1 0(4(3° 'wner: L-1 2 1 F aq <br /> S' ddress: 'CQ lV w e_ \ V-6 <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑ Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑ Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> El Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service El Framing ❑Rooftop Units ❑Water Service <br /> El Grounding El Insulation ❑ Mechanical Final ❑ Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing Cl Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> El Footing drains ❑Ceiling Grid ❑Refrigeration ❑ Rough In <br /> ❑Roof drains ,Building Final ❑Gas Pipe Final fl HWT Final <br /> OTHER OR C LTATION: 02a —5-"` - 9-O C-0 <br /> PROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> El OK FOR C.O. ❑ VIOLATIONI:4" <br /> El UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> P..640& F` -c T Z O Prteis- <br /> ,...___----___________ <br /> Inspector: 2), ar_ Date:_ 9.— / 5-1-7,6 <br /> EIR(4/09) <br />