My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1416 ROCKEFELLER AVE 2016-01-01 MF Import
>
Address Records
>
ROCKEFELLER AVE
>
1416
>
1416 ROCKEFELLER AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2017 10:53:25 AM
Creation date
2/27/2017 10:53:12 AM
Metadata
Fields
Template:
Address Document
Street Name
ROCKEFELLER AVE
Street Number
1416
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
��t <br /> C/TY OF EL/E/�ETT <br />�., _ BU/�D/NG D/L//5/O/V <br /> , �~ . 32a70 CEOAR ST. Ef�E/ZETT, H�q 9820/ (206) 259.BB/O <br />�; 1�.. <br /> �: . <br /> s s • - f - • s � <br /> 1 About this torm:This fortn isn't as involved as R iooks,because you only use portbns of k for a paA�ular <br /> dwelling proJact. Instead o1 spending t(me searching through the WSEC, this fortn wili heip orpanize and <br /> condense the requirements that apply to your proJect. It Is aiso an excelient tool for Ieaming the reside►�tial <br /> WSEC requiremerrts. <br /> Requirements are grouped by foundation,framing,Insulatbn, and ltnal inspectbn phases.This not only lets � <br /> you knoiv what you need to do but also when the Inspector will be checking for particular requirements. Use <br /> the fortn to choose compliancs options that best suk the economics and design of your proJed. <br /> A designated department energy specialist can help you wrih your questions.This torm wiii heip you compty <br /> w!th the WSEC as quickly and pafniessly as possible. <br /> Responslblllty for Intormation: Although staff inembers will heip yo�with general questtons about <br /> 2 compieting this fortn, tt is uRimately your responsibility to provide detailed iniortnation about heating systems, <br /> glazing, insulatfon,and other building specitications. Be sure to get prior approval from the Departmerrt M you <br /> later wish to make changes in your proJect. For more requ(rement detail, refer to the Washington State <br /> Energy Code, 1991 EdRfon. <br /> Pape 1, Compliance Options: Select one compllance optlon at the top of the tabie. <br /> 3 - <br /> Pages 2 through 6, ll] the shaded box sreas onlv: Provide Intormation and check circles that <br /> q apply to your specitic project.D�no1 place marks in the two left side columns labeled "COMPLIANCE <br /> HE,4UIRED' and 'INSPECTION APPROVED"or in boxes lo�ted in non-shaded areas (These a�lor <br /> department use). � <br /> Since this form will be evaluated for completeness and accuracy,you can avoid unecessary permit delays <br /> by carefully provtding all required information.You may disregard liems that don't address your part(cular <br /> buildinp or equipmem. <br /> 5 Compliance responsibillty:Thfs form wili ultimately be used for all WSEC field inspections.When ft is <br /> retumed wflh your pertnit, relevant boxes under the"C�MPLIANCE REQUIRED'column will have been <br /> chedced by the Building Department.This denotes which WSEC requirements apply to your proJect.The <br /> tnspector will inspect your dwellfng against these checked items and, when deemed acceptabie, place a <br /> second chedc In the "INSPECTION APPROVED"column. <br /> , ��. <br /> Al/ Residential Occupa�cies <br /> ElC'CfC%C f'�t'af SOUCC@ (excluding heat pumps) � <br />
The URL can be used to link to this page
Your browser does not support the video tag.