My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2209 CEDAR ST 2017-02-27
>
Address Records
>
CEDAR ST
>
2209
>
2209 CEDAR ST 2017-02-27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2017 11:14:28 AM
Creation date
2/27/2017 11:14:26 AM
Metadata
Fields
Template:
Address Document
Street Name
CEDAR ST
Street Number
2209
Notes
BACKWATER VALVE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> 1 <br /> _ BACKWATER PREVENTION DEVICE FINAL <br /> ;Iii'Arigi INSTALLATION CHECKLIST . <br /> AMerican c -I- 9-ide Sec ' e t L <br /> Installation Company Name and Contact Info.:-Sec ai't-,e,(4;74)044) -QC/5V ay,) ,O9,05-sea <br /> Date Backwater Prevention device(BWD)was installed: 15-711s-- _Date this form was completed: 5? fel S' <br /> Installation Property Owner Name and Contact Info:3 P FF r`�',hoc [C �. <br /> , 1.a `a G"L / -` <br /> Property Address: aaoci0,4 (--1 C.,.tf --1 Ll EAQ c/1 R`:o I <br /> Pre-Installation Inspection Checklist: l <br /> All items must be checked'Yes'in order for a BWD to be considered for installation <br /> Is there a basement or level of the house that is at or near assumed sewer main elevation? (es Li No <br /> Are there fixtures in the house located below the upstream sewer manhole rim elevation? ,Yes [1 No <br /> Is the side sewer currently UNPROTECTED from sewer backups(does not have a BWD installed)? Wes I I No <br /> Site Inspection Checklist: <br /> All items must be checked'Yes'before inspection is considered complete / <br /> Was side sewer TV inspected from building to sewer main? 'es n No Condition: t (f.)C <br /> Does side sewer have at least 1%slope from the building to sewer main? 'es I I No Describe: <br /> Have all building sewer drain connections to the side sewer been identified and located? pi Yes ❑No <br /> Have all property storm drainage connections to the side sewer been identified and located? f Yes L[ No <br /> Has property been evaluated for drainage deficiencies with findings communicated to property owner? )2 Yes n No <br /> Installation Details: I <br /> type e and brand of BWD was installed at this site (Clean Check BWV, Grinder pump, etc.): e,e4 St`ed) <br /> Where was the device installed (general description,attach map)? b. ( ' /' _� / - C <br /> I <br /> Was there any other sewer or storm drainage work completed in conjunction with the BWD work? Is so please describe: <br /> it <br /> Installation Checklist: <br /> Are all downspouts and site drainage disconnected from upstream of the BWD? I 'es n No Comments: <br /> Does BWD positioning meets minimum slope requirement of'1%? `es I I No Comments: <br /> Can BWD be pulled out for inspection and maintenance after loosening thumb screw? es No <br /> Is BWD locked into the pro.er position and thumb screw tightened? RbYes Li No <br /> Circle the BWD cover: rigation cover :ndscape area)I traffic load bearing cover(drive surface)/access hatch (building) <br /> Was property owner shown the location of the installed BWD? J(es [1 No Comments: <br /> Y9 <br /> Property Owner'sSignature: Date: .q.--r L <br /> -4---P <br /> P <br /> Installer's Signature: - , Date: 8 t_ 5-- /5 <br /> Revis,ion:2 1 Friday,September 12,2014 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.