Laserfiche WebLink
OOMPLIANCE��i`� � .,. ,.,��re¢�',��`� s`�'.>r"... .. : �: . .. . . .:.; ' ' <br /> • r « j,Yp dk ` " 6� ' p , a . ' <br /> �� RE�UIRED � - �� ����"� <br /> ? <br /> iNSPEcna+ IMPORTANT: DQN4I place checks In the two lett cotumns. <br /> APPROVED� <br /> , •��� <br /> CI O Q�Posed foam Insulation shall comply as follows (S.502,1.4.�: <br /> O Protected wflh metal or plastb flashing,or other suftabte material that extends below grade. <br /> p Insulation is approved for sub-qrade,exterior use and properfy installed. <br /> � O �Irtlow between fresh alr ports and the whole-house fan ensured by undercul doors/prpls(VIAQ,S.302.8.4) <br /> � O � oosellll Insulatlon OK� (S.502.1.4.5): <br /> p maximum ceilinp slope not>3 in 12 <br /> ❑230'of clear distance from top of bottom chord to underside of roof sheathing at the rool ridge. <br /> O O �mll black polyethylene ground cover, shall be lapped 12"at joints and extend to foundation wall <br /> ❑ p Clearences shall meet Iisted minimums beNveen insulation and (S.502.1.4.3): <br /> ❑chimney ❑ Non•IC rated recessed Iights: l/2"to combustables, 3"to insulatan. <br /> O O ttic hetch shall be Insulated to required ceiling R-vaiue and is weatherstripped(S.502.1.4.4) <br /> O C � AttiC eccess shall have wood dam or equivalent to retain loose fill Insulation in attic(S.502.7.4.4) <br /> p O II exterlor doors (except 20 minute doors) shall be weatherstripped(S.502.4.3). <br /> O O Senlce hot d cold water plpinp in uncondftioned spaces shali be insulated to R-3(S.503.11) <br /> � . O Service recirCulatlon hot weter plpinp In unconditioned spaces shall be Insulated (Table 5-12). <br /> p I p Heat pump thertnoslat shall have progamable capability(S.503.8.3.5) <br /> p O hertnostat pravided for each HVAC system with range ol 55-75' F.(heating) (S.503.8.7.1). <br /> p p � Readlly eccessible,automatic or Manual means provided to restricl or shut-0if Heating input to <br /> each zone or floor during periods not requirinp heat(S. 503.8.3.1). <br /> O � ntrols for backup heat prohibit similtaneous operation of the primary system (S.5032.2(5)). <br /> O O ochenical ventllation system shall have proper timers,and/or switches(VIAQ, S.302.3). <br /> O O hanlcal ventllation ezhaust ducts in �mcondit�oned spaces shall haVe fl-4(ns. (VIAQ,S.302.5) <br /> p p � echanlcal ventllatlon suppty ducts in condiftoned spaces shall have R-4 ins.(VIAQ,302.5) <br /> O O � upply ducts shall have volume dampers, or the equivalent, to balance system ins. (S. 503.6). <br /> O O � upply and return aly ducts shall have sealed duct joints in unconditioned s�,aces (S. 503.10.2). <br /> p p VAC plenums,supply,and retum ely ducts shall have R-8 insulaifon (Table 5-11, All options) <br /> p O s Water heater(s) shall have (S. 5042.1, 504.3,50A.4): <br /> ❑separate power,or gas shut-oif ❑ 1987 NAECA Label on tank <br /> ❑Elect only: noncompressible R10 pad (unheated spaces, slabs) ❑ Temperature setting s 120 F. <br /> O 0 c�howers and lavatories shall limit ilow to s 3.0 gallons/minute (S. 504.8.1). <br /> O p �wimming pools(S.504.5) shall have: <br /> p readily accessible ON/OFF switch (pump, heater) ❑Pool cover ❑Piping insulated to S.503.11 <br /> O O �s All fireplaces (VIAQ, S.402.3) shall have: <br /> ❑ 6 square inch combusUon :,ir supplyduct w/accessible damper directly connected to the tire box <br /> ❑ Tight fitlfng glass or metal doors. ❑ Tight(itting ilue damper <br /> O O 9 Solid fuet burning appliance(s) (VIAQ, S. 4022) shall have: <br /> ❑Tight tiring glass or metal doors <br /> o0utside combustion air source directly connected to lhe tire box <br /> p Exception: Non-direct,4"diameter,dampered,combustion air source: allowed only tor(t) ne��+stove <br /> installations in exfsiing homes where obstructior�s preclude direct combustion air,or(2) Central <br /> heating systems located in unheated spaces. ,. <br /> p O o Three month, etched track radon monitor,prinied instructions, and intormation sheets shall be <br /> supplied to the sfngle tamily dwelling or first floor units of multi-family dwellfngs by the general <br /> contractor(VIAQ,S. 502.2.1), <br /> WSEC Final phase requirements: <br /> Inspected by: Date <br /> Page 8 <br />