Laserfiche WebLink
EXHIBIT C <br /> REIMBURSABLE EXPENSES 12 <br /> ALTERNATE A[HOURLY RATE UP TO A MAXIMUM AMOUNT' <br /> The City shall pay CH2M Hill a sum equal to the amount of hours actually worked multiplied by the <br /> rate identified herein for the staff performing the Work, subject to the maximum stated in ¶4(D) of <br /> this Agreement. <br /> Name Responsibility Rate* <br /> Jennifer Barnes Project Manager $132 <br /> Marcela Duran Project Engineer $111 <br /> Dan O'Leary Senior Consultant $118 <br /> Brian Shuck Associate Engineer $89 <br /> Melaney Scott Project Accountant $69 <br /> Bud VanDerAa Senior Consultant $166 <br /> *Hourly rate billed will be an employee's actual raw salary rate at the time the work is performed <br /> times a 3.1 multiplier. <br /> If, and to the extent, overnight lodging in western Washington is authorized, CH2M Hill is strongly <br /> encouraged to lodge within the corporate limits of the City. When authorized, CH2M Hill will be <br /> reimbursed 100% of lodging expense, if lodged within the corporate limits of the City, but CH2M Hill <br /> will be reimbursed 50% of lodging expense when lodged outside the corporate limits of the City. <br /> 46 <br /> Rev9808 10 <br />