My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2124 ROCKEFELLER AVE 2018-01-02 MF Import
>
Address Records
>
ROCKEFELLER AVE
>
2124
>
2124 ROCKEFELLER AVE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2022 3:34:13 PM
Creation date
2/27/2017 12:24:58 PM
Metadata
Fields
Template:
Address Document
Street Name
ROCKEFELLER AVE
Street Number
2124
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT COMMENTS <br /> 4. Connect side sewer per City Standard #601. <br /> 5. Connect side sewer per City Standard#'s 601, 602, 604. <br /> G. Connect all rooftop downspouts to Ihe side sewer. <br /> 7. Connect rooftop downspouts to tlie drainage system previded for tliis lot. <br /> 8. Rooftop runoff must be discharged to a roof downspout infiltration system per Cily of Everett Storm <br /> Manual 3-2.0.2. The approximate size trench is 3.�wide, 2'deep and 25' long. See atlachment for <br /> more details. <br /> 9. The contractor must meet with the Public Works Inspeclor to discuss potential drainage routing prior to <br /> beginning the projecl. <br /> 10. Inslall erosion contrel measures as determined by the Public Works inspector, such as silt fence, straw <br /> bales, swales, or erosion blankets. <br /> 11. Inslall erosion control measures per City of Everett Slandards for small parcels <br /> 12. Remove erosion conlrol measures upon completion of Ihe project prior to(inal 2pprovai of the permit. <br /> 13. All excavated malerial (rom foundalion, sidewalk and driveways shall be hauled to an approved, <br /> permilled sile. No wasting of material is allowed on lhis building lot. <br /> 14. No dirt, inud, rocks or debris to be tracked onto roadway. <br /> 15. � No buildinc� materials to be stacked on sidewalks and sidewalks to be kept clean and open for <br /> pedestrian travel. <br /> 16. Adjust waler meler box 1"above sidewalk c�rade. <br /> 17. Remove and replace curb, c�uller and sidewalk as per Cily of Everell Standard Plan #'s 305A& 306 on <br /> this proposal's fronlage as direcled by lhe Public Works Inspector(i.e. all unused driveways and any <br /> broken or damaged area must be repla�ed). <br /> 18. Install a Type I concrete driveway per City of Everett Standard #307. <br /> 79. Pa�re driveway from the front property line out to Ihe street paving. <br /> 20. Conlact lhe Water Dislrict for connecting provisions for this building's water and <br /> sewer seivices. <br /> 2 i. A calch basin as per City Slandard Plan 1�402 wilh a gas Uap per Standard Plan#410 is required for the <br /> parking area. <br /> 22. If a sewer pump system is to be installed, lhe pressure line must discharge into a private manhole, then <br /> gravily flow across Ihe public right-of•�.vay. <br /> _3. A sprinkler system is required for this ouilding in compliance�vilh tha�ee,uiremenls of NFDA Standards <br /> 13D. <br /> P11'Cemmenls �� <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.